NewActive

The Brook- Phase 1

Gautam Buddha Nagar, Uttar Pradesh
07-06-2022
Launch Date
New
Type
05-06-2029
Completion Date

Overview

Launch Date

07-06-2022

Completion Date

05-06-2029

RERA ID

UPRERAPRJ228846

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)8007
Project NameThe Brook- Phase 1
Registration Fee (in Rs.)105000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)84
DistrictGautam Buddha Nagar
Original Start Date-
TehsilDadri
Proposed Start Date07-06-2022
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)19500
Proposed Completion Date05-06-2029

Location

Latitude

28.561092

Longitude

77.482165

Bank Details

Account Details
Name of the AccountBHPL- RERA Collection Account For Project The Brook-Phase 1
Account Number033 00 500 8409
Bank NameICICI Bank
Branch NameAnand Vihar
Branch AddressA-31, Anand Vihar, Delhi-110092
Branch StateDelhi
Branch DistrictEast Delhi
IFSC CodeICIC0000033
Separate Account Details
Name of the AccountBHPL - RERA Retention Account For Project The Brook Phase 1
Account Number033 00 500 8408
Bank NameICICI Bank Ltd
Branch NameAnand Vihar
Branch AddressA-31, Anand Vihar, Delhi-110092
Branch StateDelhi
Branch DistrictEast Delhi
IFSC CodeICIC0000033
Transaction Account Details
Name of the AccountBlessings Homz Pvt Ltd Rera Transaction Account The Brook Phase 1
Account Number164 90 500 0404
Bank NameICICI Bank Ltd
Branch NamePreet Vihar
Branch AddressB-141 Preet Vihar, Delhi-110092
Branch StateDelhi
Branch DistrictEast Delhi
IFSC CodeICIC0000164

Development Works

Demarcation of Plots

The project is demarcated with two roads each of 24mtr running along the South west Side and North West side of the plot. On the South East side it shares its boundary with Plot No. 4B and on the North East side with Plot No. 3B. The plot measures 117.84m in length and 173.38 metres in breath.

Boundary Wall

The Boundary wall will consist of brickwork upto a height of 5 Ft and with iron grill on top.

Road Work

The project will consist of 8mtr wide internal roads to facilitate vehicle and pedestrian movement.

Footpaths

The project will have footpaths for pedestrians running along the towers.

Water Supply Including Drinking Water Facilities

The Drinking water will be supplied by Greater Noida Industrial Developmen authority.

Sewer System

The project will have its own sewage tratment plan installed within the premises.

Drain

The sewage water (after treatment by STP) will flow in the main drain provided by GNIDA.

Parks

The project will be having a central park having a fragrance garden and other decorative and aesthetic plants.

Tree Planting

The project will be having trees to comply wih the norms of GNIDA

Design For Electric Supply Including Street Lighting

The company will draw its electricity from the Grid provided by UPPCL or NPCL. The company will installed solar lights to make the project energy efficient.

Community Buildings

The project will have a community hall, club, gymnasium, swimming pool etc.

Treatment and Disposal System of Sewage and Sullage water

The project will have its own sewage treatment plant within the premises.

Solid Waste Management And Disposal System

The solid waste will be disposed through stp and dried blocks will be diposed through municipality trucks by GNIDA.

Water Conservation System

The company will be using rain water harvesting to meet its common area water requirements.

Energy Management System Including Use of Renewable Energy

The project will be having enegy efficient LED at all common facilities and areas including parking and club

Fire Protection And Fire Safety System

The company will be having Fire Fighting syatem in place and Fire NOC is already taken.

Social Infrastructure And Other Public Amenities Including Public Health Services

The project will be having Club with Gynasium and swimming pool alongwith dedicated space for Yoga

Emergency Evacuation Services

The company will be having staircase and fire doors with emergency exits marked within the project

Other Miscellaneous Work

As per Building sanction plans

Documents

Lease Deed

No: 10900 | Date: 29-04-2016

Details of Encumbrances

Proforma of Allotment Letter

Proforma of Completion Certificate(Occupancy)

ENGINEERS CERTIFICATE

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 05-07-2022

Commencement Certificate

Uploaded: 07-06-2022

Other Plan(If Any)

Uploaded: 07-06-2022

Proforma of Application Form

Uploaded: 28-07-2022

Proforma of Allotment Letter

Uploaded: 11-06-2022

Proforma of Conveyance Deed

Uploaded: 05-07-2022

Proforma of Completion Certificate(Occupancy)

Uploaded: 09-06-2022

Waste Disposal Plan

Uploaded: 07-06-2022

Water Supply Plan

Uploaded: 07-06-2022

Electricity Supply Plan

Uploaded: 07-06-2022

Development Work Plan

Uploaded: 07-06-2022

Affidavit

Uploaded: 06-07-2022

CA CERTIFICATE

Uploaded: 06-07-2022

ARCHITECT CERTIFICATE

Uploaded: 05-07-2022

ENGINEERS CERTIFICATE

Uploaded: 06-07-2022

Other

Uploaded: 05-07-2022

Permits

Orignal Permit NoPLG/BP SM-01-NOV-2021 12557
Orignal Permit Date06-06-2022
Valid Upto05-06-2027
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto05-06-2029
End Date05-06-2029
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Kamal And Associates Pvt Ltd. Mr. Deepak Sharma
Contractor AddressPlot No-1, 3rd Floor, LSC Mayur Vihar, Phase-II, Delhi-110091
Architect NameDesign Forum International Pvt Ltd Arch- Mr. Anand Sharma
Architect AddressK-47, Kailash Colony, Delhi-110048
Architect Licence NumberCA/95/18738
Structural Engineer NameKeen Associates Pvt Ltd - Tajuddin Ashraf
Structural Engineer AddressH-53, First Floor, Sector-63, Noida -201301
Mobile number(Project Co-ordinator)8527561116

Land Details

AFS

Showing 4 blocks with 173 units

Property Summary

Total Carpet Area

27889.99 m²

300205.06 ft²

Total Units

417

5 different types

Blocks & Floors

4

25 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:66.88 m²
Balconies:561
Parking ratio:0.00 per unit

Block A

26 units

Block B

52 units

Block Brook Arcade

19 units

Block C

76 units

Khasra Details

Total Area

20000.00 m²

215278.00 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH-03C, Sector-12, Greater Noida West
Area(In Sq. Mt.)20000

Other Details

Contractor Name (if any)Kamal And Associates Pvt Ltd. Mr. Deepak Sharma
Contractor AddressPlot No-1, 3rd Floor, LSC Mayur Vihar, Phase-II, Delhi-110091
Architect NameDesign Forum International Pvt Ltd Arch- Mr. Anand Sharma
Architect AddressK-47, Kailash Colony, Delhi-110048
Architect Licence NumberCA/95/18738
Structural Engineer NameKeen Associates Pvt Ltd - Tajuddin Ashraf
Structural Engineer AddressH-53, First Floor, Sector-63, Noida -201301
Mobile number(Project Co-ordinator)8527561116
The Brook- Phase 1 by BLESSINGS HOMZ PVT LTDBLESSINGS HOMZ PVT LTD | ReraTracker