NewActive

Suncity Govind Sharnam

Mathura, Uttar Pradesh
01-06-2024
Launch Date
New
Type
30-06-2028
Completion Date

Overview

Launch Date

01-06-2024

Completion Date

30-06-2028

RERA ID

UPRERAPRJ585533/08/2024

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)38193
Project NameSuncity Govind Sharnam
Registration Fee (in Rs.)196000
AddressKhasara No. 393, Village - Chatikara, On Garud Govind Road, Mathura, Uttar Pradesh
Village/Locality/Sector etc.Chatikara
StateUttar Pradesh
Project Duration (In month)49
DistrictMathura
Original Start Date-
TehsilMathura
Proposed Start Date01-06-2024
Sanctioning Competent AuthorityMathura-Vrindavan Development Authority
Project Cost (in Lacs)1486
Proposed Completion Date30-06-2028

Location

Latitude

27.5660728

Longitude

77.6280290

Bank Details

Account Details
Name of the AccountSuncity Hi-Tech Projects Pvt Ltd Collection Account For Suncity Govind Sharnam
Account Number101705001859
Bank NameICICI Bank Limited
Branch NameVrindavan
Branch AddressICICI Bank Ltd. Common Building, Near Balaji Ashram, Raman Reti Road, Vrindavan - 281121
IFSC CodeICIC0001017
Branch DistrictMathura
Branch StateSelect
Branch Email Addressravinde.s@icicibank.com
Separate Account Details
Name of the AccountSuncity Hi-Tech Projects Pvt Ltd Separate Account For Suncity Govind Sharnam
Account Number101705001858
Bank NameICICI Bank Limited
Branch NameVrindavan
Branch AddressICICI Bank Ltd, Common Building, Near Balaji Ashram, Raman Reti Road, Vrindavan - 281121
Branch StateUttar Pradesh
Branch DistrictMathura
IFSC CodeICICI0001017
Transaction Account Details
Name of the AccountSuncity Hi- Tech Projects Pvt Ltd Transaction Account For Suncity Govind Sharnam
Account Number101705001857
Bank NameICICI Bank Limited
Branch NameVrindavan
Branch AddressICICI Bank Ltd, Common Building, Near Balaji Ashram, Raman Reti Road, Vrindavan-281121
Branch StateUttar Pradesh
Branch DistrictMathura
IFSC CodeICIC0001017

Development Works

Demarcation of Plots

Residential plots of different sizes, commercial plots as approved by the authority and detailed in the annexure are demarcated on ground.

Boundary Wall

No boundary wall is being provided by the developer for the individual plots. The boundary wall will be constructed by the buyers.

Road Work

All the main arteries will have flexible pavements with different thicknesses of base and sub-base courses depending upon the CBR value of the soil underneath. All sub-arteries with required design thickness bases on CBR value will be either flexible or rigid pavements.

Footpaths

All main artery roads and sub-artery roads will have footpaths in the shoulders and these footpaths will be finished with the material which will allow rain water percolation into the soil below.

Water Supply Including Drinking Water Facilities

Till the time UP Jal Nigam will be in a position to spare water from their sources for this township, underground water will be drawn for supplying to consumers. The water demand is calculated as per the water supply manual of Ministry of Housing Urban Development, Government of India. The per capita consumption of water is considered as 135 lpcd and based on this demand and estimated population water requirement has been worked out. The water distribution in township will be under gravity only and HPDE / MDPE pipes will be used for distribution, ferrules will be provided for each house connection and a water meter will be installed on service line of each dwelling unit.

Sewer System

Sub-mains with provisions to link the disposal of each and every plot through chambers/ manholes will be laid in front of all the plots and these sub-mains will be connected to the manholes of trunk mains laid in the service corridors of the arterial and sub-arterial roads. The trunk mains will ultimately terminate into the STP where the sewerage will be treated and the residual water recycled into the township through a separate line and this water will be used for horticulture purposes and flushing purposes of high rise buildings. The total network will be of RCC spun pipes of NP2 / NP3 grade.

Drain

Dual network, one for roof top rain water connected to rainwater harvesting pits provided at different locations as per the design, and the overflow of rainwater harvesting pits will be connected to the external drainage network. The external drainage network will be provided to carry the road and plot run-offs and finally disposed off into the natural storm drains.

Parks

All the parks as proposed in the layout will be developed with provision for tot-lot areas, sports activity areas, lawns, jogging tracks and shrubs shady trees as per the design.

Tree Planting

Threes of different species will be planted on the periphery of the site and along roads . The species of the trees will be almost of the similar types which are already existing in the surrounding areas of our township.

Design For Electric Supply Including Street Lighting

The source of power supply for township will be from UP Power Corporation Ltd. and network within the township will be laid by the developer, the network will be mainly underground both for HT as well as LT. The distribution will be 11 KVA and for this electrical sub-stations as per design will be erected in the township.

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

The sewerage and sullage water will be treated in STPs. The recycle water will be used for irrigation purposes.

Solid Waste Management And Disposal System

Garbage bins and collection points have been proposed in the township. A tie-up with the local municipality for organizing solid waste disposal of this township along with its other municipal areas will be entered into.

Water Conservation System

Rainwater harvesting pit numbers and size based on the design at different locations will be provided in the township and only the overflow of these pits will be drained into natural nalahs. The recycled water from STPs will be used for irrigation purposes and flushing purposes to decrease the fresh water requirement of the township.

Energy Management System Including Use of Renewable Energy

LED luminaires will be used in the township for lighting of roads and parks.

Fire Protection And Fire Safety System

As it is a township development, provisions have been made as per the National Building Code in the underground water tanks for the water required for fire fighting. Also, fire hydrants will be provided as per design, if required, on recycled water line so that in the event of emergency water can be drawn from these hydrants by the fire department.

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

As it is a township development with parks and reasonably sized open areas so evacuation will not be a problem.

Other Miscellaneous Work

The township is been developed with reasonably sized greens having neighborhood sports activities centre.

Documents

Sale Deed

No: 458 | Date: 11-01-2007

Extract of Khatauni

No: 1429-1434 (01 July 2021 to 30 June 2027) | Date: -

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Affidavit

Details of Encumbrances

Uploaded: 05-08-2024

Commencement Certificate

Uploaded: 04-06-2024

Other Plan(If Any)

Uploaded: 09-08-2024

Proforma of Application Form

Uploaded: 05-06-2024

Proforma of Allotment Letter

Uploaded: 05-06-2024

Proforma of Conveyance Deed

Uploaded: 05-06-2024

Waste Disposal Plan

Uploaded: 04-06-2024

Water Supply Plan

Uploaded: 04-06-2024

Electricity Supply Plan

Uploaded: 04-06-2024

Development Work Plan

Uploaded: 05-06-2024

Affidavit

Uploaded: 09-08-2024

CA CERTIFICATE

Uploaded: 05-08-2024

ARCHITECT CERTIFICATE

Uploaded: 05-06-2024

ENGINEERS CERTIFICATE

Uploaded: 05-06-2024

Other

Uploaded: 05-06-2024

Proforma of Agreement for Sale

Uploaded: 05-06-2024

Permits

Orignal Permit NoPlotted Resi development/Plotted Housing/04076/MVDA/LD/23-24/0812/27102023
Orignal Permit Date29-05-2024
Valid Upto28-05-2029
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto28-05-2030
End Date30-06-2028
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)GV Construction
Contractor Address1000, Radhika Vihar Phase 2, Mathura - 281004
Architect NameBrij Kumar Srivastava
Architect Address217, 2nd Floor, Suncity Business Tower, Sector 54, Gurugram-122001
Architect Licence NumberCA/2007/40587
Structural Engineer NameNA
Structural Engineer AddressNA
Mobile number(Project Co-ordinator)9999015744

Land Details

Plot

Showing 1 blocks with 4 units

Property Summary

Total Carpet Area

0.00

0.00 ft²

Total Units

0

1 different types

Blocks & Floors

1

1 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:NaN
Balconies:0
Parking ratio:NaN per unit

Block undefined

4 units

Khasra Details

Total Area

38193.00

411105.63 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No393
Area(In Sq. Mt.)38193

Other Details

Contractor Name (if any)GV Construction
Contractor Address1000, Radhika Vihar Phase 2, Mathura - 281004
Architect NameBrij Kumar Srivastava
Architect Address217, 2nd Floor, Suncity Business Tower, Sector 54, Gurugram-122001
Architect Licence NumberCA/2007/40587
Structural Engineer NameNA
Structural Engineer AddressNA
Mobile number(Project Co-ordinator)9999015744