Residential plots of different sizes, commercial plots as approved by the authority and detailed in the annexure are demarcated on ground.
No boundary wall is being provided by the developer for the individual plots. The boundary wall will be constructed by the buyers.
All the main arteries will have flexible pavements with different thicknesses of base and sub-base courses depending upon the CBR value of the soil underneath. All sub-arteries with required design thickness bases on CBR value will be either flexible or rigid pavements.
All main artery roads and sub-artery roads will have footpaths in the shoulders and these footpaths will be finished with the material which will allow rain water percolation into the soil below.
Till the time UP Jal Nigam will be in a position to spare water from their sources for this township, underground water will be drawn for supplying to consumers. The water demand is calculated as per the water supply manual of Ministry of Housing Urban Development, Government of India. The per capita consumption of water is considered as 135 lpcd and based on this demand and estimated population water requirement has been worked out. The water distribution in township will be under gravity only and HPDE / MDPE pipes will be used for distribution, ferrules will be provided for each house connection and a water meter will be installed on service line of each dwelling unit.
Sub-mains with provisions to link the disposal of each and every plot through chambers/ manholes will be laid in front of all the plots and these sub-mains will be connected to the manholes of trunk mains laid in the service corridors of the arterial and sub-arterial roads. The trunk mains will ultimately terminate into the STP where the sewerage will be treated and the residual water recycled into the township through a separate line and this water will be used for horticulture purposes and flushing purposes of high rise buildings. The total network will be of RCC spun pipes of NP2 / NP3 grade.
Dual network, one for roof top rain water connected to rainwater harvesting pits provided at different locations as per the design, and the overflow of rainwater harvesting pits will be connected to the external drainage network. The external drainage network will be provided to carry the road and plot run-offs and finally disposed off into the natural storm drains.
All the parks as proposed in the layout will be developed with provision for tot-lot areas, sports activity areas, lawns, jogging tracks and shrubs shady trees as per the design.
Threes of different species will be planted on the periphery of the site and along roads . The species of the trees will be almost of the similar types which are already existing in the surrounding areas of our township.
The source of power supply for township will be from UP Power Corporation Ltd. and network within the township will be laid by the developer, the network will be mainly underground both for HT as well as LT. The distribution will be 11 KVA and for this electrical sub-stations as per design will be erected in the township.
NA
The sewerage and sullage water will be treated in STPs. The recycle water will be used for irrigation purposes.
Garbage bins and collection points have been proposed in the township. A tie-up with the local municipality for organizing solid waste disposal of this township along with its other municipal areas will be entered into.
Rainwater harvesting pit numbers and size based on the design at different locations will be provided in the township and only the overflow of these pits will be drained into natural nalahs. The recycled water from STPs will be used for irrigation purposes and flushing purposes to decrease the fresh water requirement of the township.
LED luminaires will be used in the township for lighting of roads and parks.
As it is a township development, provisions have been made as per the National Building Code in the underground water tanks for the water required for fire fighting. Also, fire hydrants will be provided as per design, if required, on recycled water line so that in the event of emergency water can be drawn from these hydrants by the fire department.
NA
As it is a township development with parks and reasonably sized open areas so evacuation will not be a problem.
The township is been developed with reasonably sized greens having neighborhood sports activities centre.
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
38193.00 m²