Launch Date
Completion Date
RERA ID
27.57783333
77.62409444
The Plot is demarcated as per the approved plan by MVDA
Boundry wall upto 6 feet is being provided. All four wall of the plot are being covered by boundary wall making it a gated complex.
The internal road shall be in RCC. the external connecting road are also in RCC
This is a commercial development with retail on the ground floor. the footpath is actually the walkway in front of the retail shops which shall be the tiled area.
Water supply shall be taken from the main supply of the Township through overhead and UG tanks
Sewer System is also connected to main grid lines of the Township leading to the Sewerage treatment Plant
Dual Network system, one for the roof top rain water which is connected to the RWHP and other is for plot runoffs which is connected to the main drainage line of the township.
Green area being developed as per approved design. Road side berms shall be suitably landscape.
89 Trees are proposed as per the approved plan
Electric Supply shall be done from the main grid of the township through a independent 11 KV electric line and step down transformer.
NA
All the sewer waste shall be connected to main sewer line of the township
Solid waste shall be accumulated in the main township garbage collection area and shall be removed by local municipal corporation.
RWH Pit is provided as per the approved plan
LED Luminaires will be used in the building including the street and exterior lighting.
All the fire protection and fire saftey provisions are provided as per the national building code/ approved fire drgs.
NA
An emergency evacuation system shall be provided as per the fire-approved drgs.
NA
Showing 1 blocks with 14 units
Total Carpet Area
6200.76 m²
66744.36 ft²
Total Units
220
2 different types
Blocks & Floors
1
7 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
5741.00 m²
61795.55 ft²