OngoingActive

SUNCITY ANANTAM

Mathura, Uttar Pradesh
27-05-2017
Launch Date
Ongoing
Type
24-11-2023
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

24-11-2023

RERA ID

UPRERAPRJ734

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)387297
Project NameSUNCITY ANANTAM
Registration Fee (in Rs.)1941500
AddressJAIT
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)78
DistrictMathura
Original Start Date15-09-2016
TehsilMathura
Proposed Start Date27-05-2017
Sanctioning Competent AuthorityMathura-Vrindavan Development Authority
Project Cost (in Lacs)13000
Proposed Completion Date24-11-2023

Location

Latitude

27.5889

Longitude

77.6184

Bank Details

Account no.000272400000032
Name Of Account HolderSUNCITY HI-TECH PROJECTS PRIVATE LIMITED
Bank NameYES BANK
Branch AddressFORTUNE GLOBAL ARCADE, SIKANDERPUR, MEHRAULI GURGAON ROAD, GURGAON
Branch NameYES BANK FORTUNE GLOBAL ARCADE, SIKANDERPUR, MEHRAULI GURGAON ROAD, GURGAON
IFSC CodeYESB0000002

Development Works

Demarcation of Plots

Residential plots of different sizes, group housing plots, commercial plots and public and semi-public use plots as approved by the authority and detailed in the annexure are demarcated on ground.

Boundary Wall

No boundary wall is being provided by the developer for the individual plots. The boundary wall will be constructed by the buyers.

Road Work

All the main arteries will have flexible pavements with different thicknesses of base and sub-base courses depending upon the CBR value of the soil underneath. All sub-arteries with required design thickness based on CBR value will be either flexible or rigid pavements.

Footpaths

All main artery roads and sub-artery roads will have footpaths in the shoulders and these footpaths will be finished with the material which will allow rain water percolation into the soil below.

Water Supply Including Drinking Water Facilities

Till the time UP Jal Nigam will be in a position to spare water from their sources for this township, underground water will be drawn for supplying to consumers, The water demand is calculated as per the water supply manual of Ministry of housing and urban development Govt. of India. The per capita consumption of water is considered as 135 lpcd. and based on this demand and estimated population water requirement has been worked out. the town ship is divided in to 3 water zones and each Zone will have its Underground Service reservoir adequate to store 2/3rd of the 24 hr water demand, in addition to this 1/3 rd storage will be in an overhead service reservoir with a staging height which will ensure a terminal pressure adequate for a 15 mtr high building. pumps of adequate capacity will be installed in each underground water reservoir to lift the water to overhead water reservoir, arrangement of standby pumps will also be made in every underground service reservoir. The desired treatment to ensure potability of water for human consumption will be done before water is lifted to O.H. S.R for distribution. The water distribution in township will be under gravity only. and HPDE/MDPE pipes will be used for distribution, Ferrules will be provided for each house connection and a water meter will be installed on service line of each dwelling unit, Bulk supply will be provided to bigger plots of group Housing/ commercial/PSP plots. The permission to draw water will be taken from CGWB.

Sewer System

Sub-mains with provisions to link the disposal of each and every plot through chambers/ manholes will be laid infront of all the plots and these sub-mains will be connected to the manholes of trunk mains laid in the service corridors of the arterial and sub-arterial roads. The trunk mains will ultimately terminate into the STP where the sewerage will be treated and the residual water recycled into the township through a separate line and this water will be used for horticulture purposes and flushing purposes of high rise buildings. The total network will be of RCC spun pipes of NP2/NP3 grade.

Drain

Dual network, one for roof top rain water connected to Rainwater Harvesting Pits provided at different locations as per the design, and the overflow of Rainwater Harvesting Pits will be connected to the external drainage network. The external drainage network will be provided to carry the road and plot run-offs and finally disposed off into the natural storm drains connected to river Yamuna passing adjacent to the area. Both the networks will be underground and RCC spun pipes of NP2/ NP3 grade will be used to carry the storm water.

Parks

All the parks as proposed in the layout will be developed with provision for tot-lot areas, sports activity areas, lawns, jogging tracks and shrubs & shady trees as per the design.

Tree Planting

Trees of different species will be planted on the periphery of the site and along roads. The species of the trees will be almost of the similar types which are already existing in the surrounding areas of our township. Big leaf trees will also be provided on the periphery.

Design For Electric Supply Including Street Lighting

The electrical network designed for the township is as per Indian Electricity Act and rules, guide lines and regulations of UP electricity supply code 2005 and guide lines, and regulations of Uttar Pradesh Electricity regulatory Commission for electrical distribution networks in Private builders Townships. The source of supply for township will be from UP Power Corporation Ltd, and network within the township will be laid by the developer, the network will be mainly underground both for H.T as well as LT, The distribution will be 33/11/.4 KVA, the transforming of voltage will be at 11/.4 and for this electrical sub stations as per design will be erected in the town ship. As far as possible LED electrical fixtures will be used on s wedged poles along all the roads in township, the distance between poles and height of poles will be regulated by the uniform desired Lux levels without and dark spots on the roads, the Lux level of each road will be guided by the norms of relevant codes for street lighting and carriage way widths of roads.

Community Buildings

Plots for various community buildings required as per the bye laws based on the density norms have been provided in the township and have been approved by the authorities. These community plots will be sold to various interested parties for developing buildings over them. However, the plots for police chowki, police station and telephone exchanges will be handed over to the government free of cost for development.

Treatment and Disposal System of Sewage and Sullage water

As explained above the sewerage and sullage water will be treated in STPs and PHYTORID technology STP is proposed in the township. The recycle water will be used for irrigation purposes, car washing purposes and flushing purposes of high rise buildings.

Solid Waste Management And Disposal System

Door to door collection of solid waste arrangement will be made in township through the maintenance agency which will be assigned maintenance of this town ship, besides this garbage bins and collection points have been proposed in the township. A tie up with the local municipality for organizing solid waste disposal of this township along with its other municipal areas will be entered in to.

Water Conservation System

Rainwater Harvesting Pit numbers and size based on the design at different locations will be provided in the township and only the overflow of these pits will be drained into natural nalahs. The recycled water from STPs will be used for irrigation purposes, car washing purposes and flushing purposes of high rise buildings to decrease the fresh water requirement of the township.

Energy Management System Including Use of Renewable Energy

LED luminaires will be used in the township and solar energy will be used for charging the energy accumulators and lighting of roads and parks will be done with these accumulators as source for energy.

Fire Protection And Fire Safety System

As it is a township development, provisions have been made as per the National Building Code in the underground water tanks for the water required for fire fighting. Also, fire hydrants will be provided on recycled water line so that in the event of emergency water can be drawn from these hydrants by the fire department.

Social Infrastructure And Other Public Amenities Including Public Health Services

Schools from anganwadi to high school level will be developed in the township by the private players and plots as per the bye law requirements have been provided for the same. Besides these schools, community centre, health centres, bal kalyan centres and blood bank plots have been provided for.

Emergency Evacuation Services

As it is a township development with parks and reasonably sized open areas so evacuation will not be a problem.

Other Miscellaneous Work

The township is been developed with reasonably sized greens having Neighbourhood Sports activities centre.

Documents

Sale Deed

No: 10837 | Date: 26-09-2006

Sale Deed

No: 11703 | Date: 13-10-2006

Sale Deed

No: 1173 | Date: 27-01-2007

Sale Deed

No: 803 | Date: 19-01-2007

Sale Deed

No: 1343 | Date: 31-01-2007

Sale Deed

No: 2233 | Date: 20-02-2007

Sale Deed

No: 3210 | Date: 16-03-2007

Sale Deed

No: 5422 | Date: 07-05-2007

Sale Deed

No: 5432 | Date: 07-05-2007

Sale Deed

No: 5452 | Date: 07-05-2007

Sale Deed

No: 7313 | Date: 15-06-2007

Sale Deed

No: 8265 | Date: 07-07-2007

Sale Deed

No: 8525 | Date: 16-07-2007

Sale Deed

No: 9061 | Date: 25-07-2007

Sale Deed

No: 9053 | Date: 25-07-2007

Sale Deed

No: 1588 | Date: 18-02-2008

Sale Deed

No: 2335 | Date: 11-03-2008

Sale Deed

No: 2202 | Date: 05-03-2008

Sale Deed

No: 3219 | Date: 02-04-2008

Sale Deed

No: 3177 | Date: 31-03-2008

Sale Deed

No: 3644 | Date: 11-04-2008

Sale Deed

No: 5401 | Date: 28-05-2008

Sale Deed

No: 21 | Date: 29-05-2008

Sale Deed

No: 30 | Date: 08-08-2008

Sale Deed

No: 11475 | Date: 14-07-2015

Sale Deed

No: 593 | Date: 15-01-2007

Sale Deed

No: 2058 | Date: 15-02-2007

Sale Deed

No: 4064 | Date: 02-04-2007

Sale Deed

No: 4323 | Date: 07-04-2007

Sale Deed

No: 5035 | Date: 26-04-2007

Sale Deed

No: 5049 | Date: 27-04-2007

Sale Deed

No: 8390 | Date: 11-07-2007

Sale Deed

No: 10427 | Date: 31-08-2007

Sale Deed

No: 11474 | Date: 14-07-2015

Sale Deed

No: 1758 | Date: 22-02-2008

Sale Deed

No: 2247 | Date: 07-03-2008

Sale Deed

No: 2336 | Date: 11-03-2008

Sale Deed

No: 2339 | Date: 11-03-2008

Sale Deed

No: 2644 | Date: 17-03-2008

Sale Deed

No: 2688 | Date: 18-03-2008

Sale Deed

No: 2948 | Date: 27-03-2008

Sale Deed

No: 5200 | Date: 23-05-2008

Sale Deed

No: 5234 | Date: 24-05-2008

Sale Deed

No: 1968 | Date: 03-02-2010

Sale Deed

No: 12924 | Date: 04-08-2012

Sale Deed

No: 10983 | Date: 13-06-2013

Sale Deed

No: 9953 | Date: 17-06-2015

Sale Deed

No: 8290 | Date: 27-05-2015

Sale Deed

No: 7933 | Date: 22-05-2015

Commencement Certificate

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 25-05-2018

Proforma of Application Form

Uploaded: 24-05-2018

Proforma of Allotment Letter

Uploaded: 24-05-2018

Proforma of Conveyance Deed

Uploaded: 25-05-2018

Waste Disposal Plan

Uploaded: 24-05-2018

Water Supply Plan

Uploaded: 24-05-2018

Electricity Supply Plan

Uploaded: 24-05-2018

Development Work Plan

Uploaded: 24-05-2018

Affidavit

Uploaded: 24-05-2018

CA CERTIFICATE

Uploaded: 13-10-2020

ARCHITECT CERTIFICATE

Uploaded: 13-10-2020

ENGINEERS CERTIFICATE

Uploaded: 13-10-2020

Other Plan(If Any)

Uploaded: 27-07-2017

Permits

Orignal Permit No10/V/2016-17
Orignal Permit Date27-05-2017
Valid Upto26-05-2022
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto-
End Date26-05-2022
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit NoPlotted Resi development/Plotted Housing/02550/MVDA/LD/22-23/0520/15102022
Orignal Permit Date29-11-2022
Valid Upto28-11-2027
Revalidated Permit NoPlotted Resi development/Plotted Housing/02550/MVDA/LD/22-23/0520/15102022
Revalidated Permit Date29-11-2022
Revalidated Permit Valid Upto01-01-1900
Permit Extendable Upto28-11-2027
End Date25-11-2022
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit NoPlotted Resi development/Plotted Housing/02550/MVDA/LD/22-23/0520/15102022
Orignal Permit Date29-11-2022
Valid Upto28-11-2027
Revalidated Permit NoPlotted Resi development/Plotted Housing/02550/MVDA/LD/22-23/0520/15102022
Revalidated Permit Date29-11-2022
Revalidated Permit Valid Upto01-01-1900
Permit Extendable Upto28-11-2028
End Date24-11-2023
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)G.V. CONSTRUCTION
Contractor Address1000, RADHIKA VIHAR, PHASE-2, MATHURA, TEHSIL & DI
Architect NameMEENAKSHI KAPUR
Architect Address224, SUNCITY BUSINESS TOWER, SECTOR 54, GURUGRAM- 122002
Architect Licence NumberCA/2005/36433, AITP/2013/219
Structural Engineer NameN.A
Structural Engineer AddressN.A
Mobile number(Project Co-ordinator)9654128055

Khasra Details

Total Area

426964.00

4595797.80 ft²

36 plots
Khasra
TypeKhasra
Khasra/Plot No475
Area(In Sq. Mt.)1835
Khasra
TypeKhasra
Khasra/Plot No477
Area(In Sq. Mt.)24261
Khasra
TypeKhasra
Khasra/Plot No525
Area(In Sq. Mt.)28760
Khasra
TypeKhasra
Khasra/Plot No529
Area(In Sq. Mt.)3090
Khasra
TypeKhasra
Khasra/Plot No585
Area(In Sq. Mt.)11940
Khasra
TypeKhasra
Khasra/Plot No590
Area(In Sq. Mt.)59016
Khasra
TypeKhasra
Khasra/Plot No597
Area(In Sq. Mt.)6444
Khasra
TypeKhasra
Khasra/Plot No603
Area(In Sq. Mt.)7824
Khasra
TypeKhasra
Khasra/Plot No605
Area(In Sq. Mt.)6580
Khasra
TypeKhasra
Khasra/Plot No606
Area(In Sq. Mt.)6520
Khasra
TypeKhasra
Khasra/Plot No607
Area(In Sq. Mt.)13470
Khasra
TypeKhasra
Khasra/Plot No612
Area(In Sq. Mt.)5837
Khasra
TypeKhasra
Khasra/Plot No613
Area(In Sq. Mt.)8770
Khasra
TypeKhasra
Khasra/Plot No615
Area(In Sq. Mt.)5200
Khasra
TypeKhasra
Khasra/Plot No616
Area(In Sq. Mt.)5200
Khasra
TypeKhasra
Khasra/Plot No618
Area(In Sq. Mt.)5190
Khasra
TypeKhasra
Khasra/Plot No621
Area(In Sq. Mt.)22105
Khasra
TypeKhasra
Khasra/Plot No622
Area(In Sq. Mt.)20012
Khasra
TypeKhasra
Khasra/Plot No684
Area(In Sq. Mt.)24680
Khasra
TypeKhasra
Khasra/Plot No686
Area(In Sq. Mt.)2590
Khasra
TypeKhasra
Khasra/Plot No688
Area(In Sq. Mt.)36590
Khasra
TypeKhasra
Khasra/Plot No699
Area(In Sq. Mt.)6250
Khasra
TypeKhasra
Khasra/Plot No700
Area(In Sq. Mt.)11540
Khasra
TypeKhasra
Khasra/Plot No705
Area(In Sq. Mt.)2930
Khasra
TypeKhasra
Khasra/Plot No706
Area(In Sq. Mt.)5860
Khasra
TypeKhasra
Khasra/Plot No709
Area(In Sq. Mt.)16620
Khasra
TypeKhasra
Khasra/Plot No719
Area(In Sq. Mt.)6060
Khasra
TypeKhasra
Khasra/Plot No726
Area(In Sq. Mt.)8080
Khasra
TypeKhasra
Khasra/Plot No728
Area(In Sq. Mt.)9940
Khasra
TypeKhasra
Khasra/Plot No729
Area(In Sq. Mt.)4980
Khasra
TypeKhasra
Khasra/Plot No731
Area(In Sq. Mt.)4980
Khasra
TypeKhasra
Khasra/Plot No733
Area(In Sq. Mt.)15860
Khasra
TypeKhasra
Khasra/Plot No737
Area(In Sq. Mt.)14380
Khasra
TypeKhasra
Khasra/Plot No680/683
Area(In Sq. Mt.)12330
Khasra
TypeKhasra
Khasra/Plot No708g
Area(In Sq. Mt.)560
Khasra
TypeKhasra
Khasra/Plot No708k
Area(In Sq. Mt.)680

Other Details

Contractor Name (if any)G.V. CONSTRUCTION
Contractor Address1000, RADHIKA VIHAR, PHASE-2, MATHURA, TEHSIL & DI
Architect NameMEENAKSHI KAPUR
Architect Address224, SUNCITY BUSINESS TOWER, SECTOR 54, GURUGRAM- 122002
Architect Licence NumberCA/2005/36433, AITP/2013/219
Structural Engineer NameN.A
Structural Engineer AddressN.A
Mobile number(Project Co-ordinator)9654128055