Temporary Boundary Wall is already present at the sitee. However, permanent boundary wall made of ACC block and RCC is under construction At the center face of boundary wall there would be a Logo of Sky Bungalow which give a beautiful iconic design to boundary wall.
Approach road from the main gate of NRI City to the project site is well developed. Internal roads are already demarcated and shall be develpoed at appropriate stage of the project
Interlock footpath at both side of the apporach road with beautiful pattern is already developed
Project shall rely for drinking water supply through bore well as well as through Municipal Corporation.
Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.
Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
1 main park nearby temple having kids play area is already developed. One more park is proosed to be developed at the appropriate stage of the project
More than 300 trees have already been planted. However, more tree plantation is in process
Designing of Electrc supply including street lighting is already being done.
It shall be developed at appropriate stage of the project
Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.
"There are a proper garbage collection area provided for the solid waste management."
We are providing Fitting and fixtures having low outflow of water as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
We will use LED lights fitting in external area. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use LED lights Fitting.
Project hall have fire protection and fire safety system as per regulatory norms
"Sewerage ,Storm water and water supply system shall be Provided. We have Proposed common Pump Room. All Sewerage shall be go to the STP. Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain."
Project shall have emergency evacuation plan as per the requirement of regulatory authorities
Nil
Showing 1 blocks with 95 units
Total Carpet Area
38649.82 m²
416022.80 ft²
Total Units
141
6 different types
Blocks & Floors
1
24 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3762.00 m²
40493.79 ft²