Launch Date
Completion Date
RERA ID
28.70355
77.43797
SITE LOCATED AT KHASRA NO 1174(P) VILLAGE NOOR NAGAR PARGANA TEHSIL LONI GHAZIABAD FACING OF TOWERS EAST IS ROAD 6MTR WIDE,WEST ROAD 6MTR WIDE,NORTH 6M ROAD AND SOUTH 6MTR ROAD ALONG BOUNDARY WALL, NORTH WEST SIDE MAIN ENTRY ROAD 45 MTRS.
ALL SIDES 3 MTR HEIGHT BRICK WORK BOUNDARY WALL WITH FENCING.
INTERLOCKING BLOCK HAVE BEEN PROVIDED AT RAOD AREA, EAST IS 6MTR WIDE,WEST ROAD 6MTR WIDE, NORTH IS 6MTR WIDE AND SOUTH 6MTR ROAD ALONG BOUNDARY WALL NORTH WEST SIDE MAIN ENTRY ROAD 45 MTRS. INTERLOCKING BLOCK HAVE BEEN PROVIDED AT ROAD AREA.
INTER LOCKING PAVER HAVE BEEN PROVIDED AT PROJECT ENTRY FOOTPATH.
323 KLD WATER TANK FOR SUPPLY FOR STORAGE TANK AND TERRACE TANK CAPACITY.
UNDER GROUND SYSTEM USING SEWER PIPES WITH 300KLD CAPACITY.
UNDERGROUND SYSTEM USING UPVC PIPE
AS PER BYE LAWS OF GDA 10 GREEN AREA PROVIDED WITH TREES. ARE AS PER APPROVED MAP OF GREEN AREA 661.321 MTR.
TREE PLANTING AS PER APPROVED DRAWINGS BY GDA. ALSO PROVIDED IN PARKS AND FRONT OF PROJECT ENTRY GATE. AS PER APPROVED LAYOUT REQUIRED NO. OF TREE 38.
TRANSFORMERS (COMPACT SUB STATION) SHALL BE USED ALONG WITH NECESSARY SWITCH GEAR FOR DISTRIBUTING ELECTRICITY AT LT VOLTAGE. TOTAL POWER REQUIRED 778 KVA AND PROVIDE DG SET. ALL STREET LIGHT SHALL BE LED BASED FOR ENERGY SAVING.
COMMUNITY SPACE AS PER APPROVED DRAWINGS BY GDA.
STP OF 300 KLD CAPACITY SHALL BE PROVIDED. TREATMENT WATER SHALL BE USED FOR FLUSHING,IRRIGATION, CAR WASHING,PATHWAYS CLEANING AND EXCESS WATER SHALL BE DISCHARGED INTO THE MINICIPAL SEWER AS PER SITE.
SOLID WASTE COLLECTION DUSTBINS PROPOSED IN EACH TOER. RECYCLE AND NON RECYCLE WASTE WILL BE DISPOSED THROUGH A LOCAL APPROVED AGENCY.
2 NOS RAINWATER HARVESTING FACILITIES SHALL BE PROVIDED AND TREATED SEWRAGE WATER SHALL BE RECYCLED TO THE EXTENT FEASIBLE.
SOLAR PANEL SHALL BE PROVIDED FOR STREET LIGHTS.
FIRE TENDER PATH SHALL BE PROVIDED AS PER NBC. FIRE FIGHTING SYSTEM ALONG WITH PUMP AND WATER STORAGE TANKS SHALL BE PROVIDED AS PER NBC AND NOC UPES/2021/40712/GZB/GHAZIABAD/2888/CFO FROM FIRE DEPTT.
COMMUNITY SPACE AS PER APPROVED DRAWING BY GDA
FIRE STAIR CASE HAVE BEEN PROVIDED AS PER APPROVED FIRE NOC UPFS/2021/40712/GZB/GHAZIABAD/2888/CFO FOR EVACUATION.
NA
Showing 2 blocks with 172 units
Total Carpet Area
17299.57 m²
186210.84 ft²
Total Units
425
4 different types
Blocks & Floors
2
17 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
6578.00 m²
70804.93 ft²