SINGLE PLOT OF 5000 METRES SEPERATELY IDENTIFIED PLOT NO C-18, POCKET-03, LFD-03, SECTOR-19, GYC, YAMUNA EXPRESSWAY IN TOWNSHIP GAUR YAMUNA CITY
RCC FRAME STRUCTURE WITH COLUMN AT 3M C/C (APPROX 1500MM HEIGHT) WITH PLINTH BEAM AND TOP BEAM FILLED WITH BRICK WORK. MS RAILING OF ABOUT 300 MM HEIGHT
NO INTERNAL ROADS IN THE PROJECT. PROJECT IS PART OF THE TOWNSHIP "GAUR YAMUNA CITY" . RAMPS WILL BE CONSTRUCTED FOR ENTRY AND EXIT FROM THE BASEMENT. SET BACK AREA IS CONSTRUCTED WITH CC CONCRETE/PAVER BLOCKS /STONE WITH PROPER SLOPES AND GRADE
FOOTHPATH OUTSIDE THE PROJECT WILL BE CONSTRUCTED BY GAUR YAMUNA TOWNSHIP. INTERNAL FOOTHPATH WILL BE CONSTRUCTED WITH HEAVY DUTY TILES/PAVER BLOCKS/ STONE AS PER DRAWINGS
SUPPLY TO THE PROJECT WILL BE PROVIDED BY TOWNSHIP/MUNICIPAL AUTHORITIES. PROVISION OF WATER SUPPLY IN EACH UNIT THROUGH UPVC PIPELINE WORK. OVERHEAD TANKS WILL BE CONSTRUCTED ON THE BUILDING UNIT FOR 24 HOURS WATER SUPPLY
INTERNAL SEWAGE SYSTEM WILL BE DEVELOPED BY THE COMPANY WITH PROPER MANHOLES AT THE REQUIRED INTERVALS AND EXTERNAL SEWAGE CONNECTION WILL BE CONNECTED TO SEWER OF TOWNSHIP/MUNICIPAL AUTHORITIES THROUGH PVC/CEMENT PIPES
DRAIN VIA HANGING PVC LINES WILL RUN FROM THE ROOF AND FROM EVERY FLOOR TOWARDS THE BASEMENT. EXTERNAL DRAINAGE WILL BE PROVIDED ALONG THE INTERNAL ROADS WITH PROPER WATER HARVESTING PITS.
NOT APPLICABLE FOR THIS PROJECT
TREES WILL BE PLANTED IN FRONT OF THE BUILDING AS PROPOSED BY THE LANSCAPE CONSULTANT AND MENTIONED IN THE APPROVED MAPS BY THE AUTHORITY
SINGLE POINT CONNECTION WILL BE TAKEN FROM UPPCL AND ELECTRIC SUPPLY WILL BE PROVIDED TO EACH UNIT THROUGH A SEPERATE METER INSTALLED AT EACH FLOOR. AND COMMON AREA LIGHTING WILL BE PROVIDED BY THE COMPANY AT THE NECESSARY PLACES. PROJECT INTEGRAL PART OF TOWNSHIP WHERE STREET LIGHTING WILL BE DONE BY TOWNSHIP.
NOT APPLICABLE FOR THIS PROJECT
STP PLANT OF APPROXIMATE 80KLD WILL BE CONSTRUCTED AT SITE AND TREATED WATER FROM THE STP WILL BE TAKEN TO A SEPERATE OVERHEAD TANK THROUGH WHICH CONSUMERS CAN USE IT FOR FLUSHING AND IRRIGATION PURPOSES.
COMPOST MACHINE WILL BE INSTALLED IN BASEMENT FOR SOLID WASTE MANAGEMENT AND OUTPRODUCT WILL BE CARRIED OUT BY OUTSIDE AGENCY. ALSO AN OUTSIDE AGENCY WILL BE APPOINTED FOR COLLECTION OF GARBAGE
ROOF TOP RAIN WATER HARVESTING SYSTEM AND INTERNAL ROAD SURFACE DRAINAGE WITH RAIN WATER HARVESTING WITH HARVESTING PITS CONSTRUCTED AT REQUIRED INTERVALS
SOLAR ENERGY PANELS WILL BE INSTALLED AT THE ROOFTOP FOR THE PURPOSE OF COMMON AREA LIGHTENING
PA SYSTEM, FIRE ALARMS, FIRE SMOKE DETECTION SYSTEM, SPRINKLERS, EXHAUST FANS WILL BE PROVIDED IN BASEMENT AS PER DRAWINGS OF CONSULTANT
PROJECT IS PART OF TOWNSHIP
FIRE EXTINGUISHERS WILL BE INSTALLED ON EACH FLOOR AT REQUIRED PLACES. SIGNAGES WILL BE INSTALLED AT THE REQUIRED PLACES IN THE BUILDING FOR ENTRY AND EXIT PURPOSES. STAIRCASE WITH PROPER SIGNAGES WILL BE PROVIDED IN CASE OF EMERGENCY EVACUATION
NOT APPLICABLE
Showing 1 blocks with 423 units
Total Carpet Area
6522.43 m²
70206.78 ft²
Total Units
423
2 different types
Blocks & Floors
1
6 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
5000.00 m²
53819.50 ft²