Launch Date
Completion Date
RERA ID
26.677869
80.977878
The total plot size is 8823.84 Sqm on which both phase-1 and phase-2 are being proposed. This phase-2 is for 5758 sq mtrs. Project having one main entrance gate situated on 60 m wide Morawan road.
2.0 m high boundary wall with RCC structure and brick work combination. Main gate will be constructed after leaving required road widening.
Most of the internal roads will be concrete road with desired finish having adequate width as per norms. Width of road- 6.00 M
Footpath will be as per land scape plans as suggested by architects.
The project will have underground tanks for domestic and fire fighting needs which will be pumped via pipes to terrace tanks.
Proper sewerage system will be provided which will be treated through sewage treatment plants and surplis treated water after use will be discharged into municipal sewer available. Capacity of STP- 200 KLD
Storm water drains will be provided to take the road water to appropriate discharge while roof top rain water will be connected to the Rain water harvesting system.Overflow of the rain water harvesting wigain connected the municipal drain line.
Parks and green areas have been provided as per land scape designs which are having kids play equipments and other facilities.
We will provide various type of trees alonf the boundry walls as per numbers required
We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc.
NA
Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force.
There are a proper garbage collection area provided for the solid waste management.
We will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
We will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authorities requirement.
NA
We will have staircases which will be provided with emergency exit doors and emergency exit gates
NA
Showing 1 blocks with 111 units
Total Carpet Area
13137.20 m²
141407.51 ft²
Total Units
208
3 different types
Blocks & Floors
1
13 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
5758.00 m²
61978.54 ft²