Launch Date
Completion Date
RERA ID
26.73
80.88
Done using Total Station Technique. All Plots Demarcated withs Bricks and Iron Pillars.
Boundary Wall around entire development with Pillars and Barbed wire.
Mix of Tar,CC,RCC and Paver Blocks.
To be made of Paver Blocks.
Borewell,OHT,HDFE underground Pipeline provided for water supply facilities.
Underground HUME PIPES with Chambers& Sediment Tank . STP using BIDMEDIA as per CPCB & NGT Norms.
Along the Footpath & Roads.
Provided as 15% requirement of LIDA(Approving Authority)
In Parks & Dividers as per LIDA Norms.
GI Poles & HALONIX LED Street Lights underground electric supply using Armoured Cables.
Club House.
Septic Tank & STP using BIOMEDIA as per CPCB & NGT Norms.
Septic Tank & STP using BIOMEDIA as per CPCB & NGT Norms.
Rain Water Recharge Pits made , Water filtered from STP to be used to Water Green Areas.
To be done by Plot owners.
Not Applicable
Not required as per LIDA. All amenities/utilities available within 2 km.
All the internal roads connecting the plots are minimum 7.5 mtrs. to 12 mtrs. wide enabling Emergency Evacuation by Vehicle or on foot at any time.
All works as described in Sanction.
Showing 1 blocks with 3 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
26148.86 m²
281463.71 ft²