Launch Date
Completion Date
RERA ID
28.64555556
77.48666667
ENCLOSED WITH BOUNDARY WALL HAVING HEIGHT OF 2.40 MTR. AND CONCERTINA WIRE HAVING HEIGHT OF 0.6 MTR. ABOVE BOUNDARY WALL.
COMBINATION OF RCC COLOUMN WITH BRICK WORK, PLASTER/PAINT.
ROAD PATTERN IS PROVIDED IN SUCH A WAY THAT APPROACH TO TOWER IS MOTORABLE AND SECTION CONSISTS OF SUB GRADE PREPARATION WITH 1 LAYER GSB AND 1 LAYER OF WMM AND BLACK TOP/ CEMENT CONCRETE PAVEMENT.
COMBINATION OF KERB STONE/ PAVERS/ MOSAIC GRIT ON COMPACTED SUB GRADE.
SYSTEM FOR DRINKING WATER IS GROUND WATER AND PROVIDED THROUGH UNDERGROUND/ OVERHEAD WATER TANKS SUBJECT TO PAYMENT OF CHARGES, AS APPLICABLE.
HOUSEHOLD SEWERAGE IS COLLECTED THROUGH SEWAGE LINE UPTO THE COMMON STP ESTABLISHED FOR THE PROJECT AND AFTER TREATMENT, THE SLUDGE AND TREATED WATER OBTAINED SHALL BE USED GREEN AREAS AND ALSO FOR FLUSHING LINES.
RAIN WATER COLLECTION SHALL BE DONE FROM TERRACE THROUGH STORM WATER LINES/ COVERED DRAINS AT GROUND LEVEL AND CONNECTED TO RAIN HARVESTING PITS.
PROVISION OF GREEN AREA FOR ENTIRE URBAN HOMES INCLUDING THIS PROJECT.
PLANNED TREES ARE 25 NOS. ACCORDINGLY IN OPEN AREAS AND ALONG SIDE THE BOUNDARY WALL, DIFFERENT TYPES OF TREES ARE PROVIDED.
ELCTRICAL CONNECTION FOR THE ENTIRE URBAN HOMES INCLUDING THIS PROJECT FROM PVVNL OF ITS LICENCEE/SUB LICENCEE AND CONNECTION WILL BE PROVIDE TO CUSTOMERS THROUGH PREPAID METER AND PROPORTIONATE ELECTRICITY INFRASTRUCTURE COST INCLUDING FEDER CONSTRUCTIONS EXPENSES, SUB STATIONS/ PANELS/TRANSFORMERS/ OTHER EQUIPMENTS/ EXPENSES CABLING, EXPENSES SYSTEM LOADING CHARGES, SECURITY CHARGES ETC. AS APPLICABLE AND FURTHER SUBJECT TO FIXED ELECTRICITY CHARGES, USAGE/CONSUMPTION CHARGES AND ENERGY LOSSES/ LINE DISTRIBUTION LOSSES AND PAYMENT OF TAXES/CESS /DUTIES/LEVY AS APPLICABLE WILL BE PAID BY CUSTOMERS AS PER DEMAND FROM TIME TO TIME
NILL
STP PROVIDED FOR TREATING HOUSEHOLDS SEWERAGE AND THE TREATED SLUDGE/ WATER IS BEING USED FOR GREEN AREAS AND FLUSHING SYSTEM FOR ENTIRE URBAN HOMES INCLUDING THIS PROJECT.
HOUSE TO HOUSE COLLECTION SYSTEM HAS BEEN PROVIDED WITH AND ARRANGEMENT OF SEPARATE COLLECTION OF DECOMPOSABLE AND NON DECOMPOSABLE WASTE IN SEPARATE BAGS AND A TREATMENT ARRANGEMENT IS DONE FOR SAME.
UNDER GROUND RECHARGE PITS WITH PERFORATED FILTER MEDIA SUED FOR RAIN WATER HARVESTING PROVIDED.
N.A.
VERTICAL RISERS WITH FHC SHOFT, MOEFA WITH PA SYSTEM AND A PUMP ROOM WITH A PROVISION OF JOCKEY/ MAIN/DIESEL PUMP ETC. IS DONE FOR ENTIRE URBAN HOMES PROJECT.
NILL.
FIRE STAIRECASE PROVIDED.
N.A.
Showing 1 blocks with 26 units
Total Carpet Area
14722.89 m²
158475.72 ft²
Total Units
546
1 different types
Blocks & Floors
1
13 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
6320.00 m²
68027.85 ft²