Launch Date
Completion Date
RERA ID
28.6426
77.48899
Enclosed with boundary wall
Combination of Brick work/Plaster
Road pattern is provided in such a way that approach to the towers is motorable and section consists of Subgrade prepration with 1 layer GSB and 1 layer of WMM & black top/Cement Concrete
N.A.
System for drinking water is ground water and provided thru Underground/overhead Water tank
Sewerage is collected through sewage lines upto the common STP established for the project and after treatment the sludge and treated water obtained shall be used in green areas like gardens,parks,green landscapes
Rain water collection shall be done from terrace thru storm water lines/covered drains at ground level and connected to common rain harvesting pits.
There is no park,however provision of green area for entire project
Planned trees are provided along the boundarywall
Electrical connection for the project from PVVNL or its Licenscee/Sub-Licenscee and connection will be provided to customers thru prepaid meter and proportinate electricity infrastructure cost including feeder construction expenses,substations/panels/transformers/other equipments /expenses,cabling expenses,system loading charges ,security charges etc as applicable and further subject to regular payments of fixed elcectricity charges,usage/consumption charges and energy losses/line distribution losses and payment of taxes/cess/duties/levy as applicable and demanded from time to time
N.A.
Common STP of the project provided for treating sewerage and the treated Sludge/water is being used for green areas
N.A.
Common Underground recharge pits with perforated filter media used for rain water harvesting provided
N.A.
Vertical risers with FHC shaft with terrace Pump to be done.
NIL
N.A.
N.A.
Showing 1 blocks with 9 units
Total Carpet Area
352.53 m²
3794.60 ft²
Total Units
30
1 different types
Blocks & Floors
1
3 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
31090.00 m²
334649.65 ft²