Launch Date
Completion Date
RERA ID
28.64333
77.4875
Enclosed with Boundary wall
Combination of RCC column with brick work ,plaster/paint
Road pattern is provided in such a way that approach to all the towers is motorable and section consists of Subgrade prepration with 1 layer GSB and 1 layer of WMM & black top/Cement Concrete pavement
Combination of Kerb stone/pavers/mosaic grit on compacted subgrade
System for drinking water is ground water and provided thru underground/overhead Water tanks
HouseHold Sewerage is collected through sewage lines upto the common STP established for the project and after treatment the sludge and treated water obtained shall be used in green areas like gardens,parks,green landscapes and also for flushing lines
Rain water collection shall be done from terrace thru storm water lines/covered drains at ground level and connected to rain harvesting pits.
Provision of green area for entire project
Planned trees are 46 Nos. accordingly in Open areas and along the boundarywall different types of trees are provided
Electrical connection for the project from PVVNL or its Licenscee/Sub-Licenscee and connection will be provided to customers thru prepaid meter and proportinate electricity infrastructure cost including feeder construction expenses,substations/panels/transformers/other equipments /expenses,cabling expenses,system loading charges ,security charges etc as applicable and further subject to regular payments of fixed elcectricity charges,usage/consumption charges and energy losses/line distribution losses and payment of taxes/cess/duties/levy as applicable and demanded from time to time
A common club cum swimming pool alongwith Gym etc provided for entire Urban Homes project
STP provided for treating household sewerage and the treated Sludge/water is being used for green areas and flushing system
House to House collection system has been provided with a arrangment of separate collection of decomposable and non decomposable waste in separate bags and a treatment arrangement is done for the same
Underground recharge pits with perforated filter media used for rain water harvesting provided
NA
Vertcial risers with FHC shaft,MOEFA with pa system and a pump room with a provison of Jockey/Main/diesel pump etc is done
NIL
Fire Staircase provided
NA
Showing 4 blocks with 56 units
Total Carpet Area
21225.79 m²
228472.28 ft²
Total Units
672
1 different types
Blocks & Floors
4
14 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
13684.00 m²
147293.21 ft²
Processing Time
416 days
From application to approval
31-10-2023
20-12-2024