Plot is already well demarcated and the construction of proposed project is already started.
Bricks made boundary wall combination of RCC is proposed around the project.
24 Mt. wide road already constructed by the competent authority and 8 Mt. wide setback is proposed around the project.
Footpath will be built through inter-locking tiles.
Overhead water tanks shall be provided on the building terrace for distribution through gravity.
A ventralized sewerage system shall be provided which will be connected to the municipal sewerage.
The storm water system shall be provided which will be connected to the municipal drain line.
There is no park but green area is proposed as per sanction plan.
There are several provisions for tree planting as per the approved area of the whole project.
We have designed the system as per local Electricity Board and consider centralized transformer, HT panel, LT panel, Feeder Pillar, and DG backup for common services like external lighting.
There is no community buildings in our project.
A centralized sewerage system shall be provided which will be connected to the municipal sewerage system.
There is proper garbage collection area for solid waste management.
A well designed rainwater harvesting system shall be provided.
We will use LED lights as well as solar lights in external areas.
Since the building is less than 50 meter in Height all the fire norms shall be followed as per NBC and approval of the fire department.
N.A.
The staircase will be provided with emergency exit doors in each floor.
Luxurious entrance lobby shall be provided.
Showing 1 blocks with 30 units
Total Carpet Area
2385.21 m²
25674.16 ft²
Total Units
40
2 different types
Blocks & Floors
1
7 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
1665.00 m²
17921.89 ft²