NewActive

The River Castel Phase-1

Sitapur, Uttar Pradesh
01-01-2021
Launch Date
New
Type
23-12-2025
Completion Date

Overview

Launch Date

01-01-2021

Completion Date

23-12-2025

RERA ID

UPRERAPRJ535719

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)48431
Project NameThe River Castel Phase-1
Registration Fee (in Rs.)495000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)60
DistrictSitapur
Original Start Date-
TehsilMisrikh
Proposed Start Date01-01-2021
Sanctioning Competent AuthorityAny Other Competent Authority
Project Cost (in Lacs)5175
Proposed Completion Date23-12-2025

Location

Latitude

27.3289680

Longitude

80.4919050

Bank Details

Account Details
Name of the AccountRAV Global Solution Private Ltd. collection account
Account Number50200058764492
Bank NameHDFC Bank Ltd.
Branch NameMishrikh Sitapur
Branch AddressSitapur Road Mishrikh Sitapur UP-261401
IFSC CodeHDFC0009520
Branch DistrictSitapur
Separate Account Details
Name of the AccountRAV Global Solution Pvt. Ltd. Separate Account
Account Number50200058639101
Bank NameHDFC BANK LTD.
Branch NameMishrikh Sitapur
Branch AddressSitapur Road Mishrikh Sitapur UP-261401
IFSC CodeHDFC0009520
Branch DistrictSitapur
Transaction Account Details
Name of the AccountRAV Global Solutions Pvt. Ltd. Transaction Account
Account Number50200057396757
Bank NameHDFC Bank Ltd.
Branch NameMishrikh Sitapur
Branch AddressSitapur Road Mishrikh Sitapur UP-261401
IFSC Codehdfc0009520
Branch DistrictSitapur

Development Works

Demarcation of Plots

The land is already well demarcated where the project is situated all the construction and development of villa will be done under the demarcated land as per sanctioned plan

Boundary Wall

Boundary wall is proposed for security purpose there will be boundary wall around the project as per sanctioned plan.

Road Work

Concrete road with bituminous cover with high quality concrete pavers is proposed as per sanctioned plan

Footpaths

Footpath is proposed at both side of road using interlocking paver block as per specified in approved plan.

Water Supply Including Drinking Water Facilities

Water supply can be provided threw submersible and Over Head Water Tank with connecting pipeline to each villa and common amenities.

Sewer System

A well designed ecofriendly sewer system will be designed for the entire project as per sanctioned plan.

Drain

The storm water system shall be provided which will be connected to the Rain Water harvesting system as per sanctioned plan.

Parks

A well decorated park with many types of flower plants, bushes , trees with yoga/Naturopathy/ Meditation zone, exercise zone and Child Play area, Adults Play Area, Jogging Track and Cycling Track, Golf Course is proposed for entire project, as per sanctioned plan.

Tree Planting

We are developing top class villas with lots of greenery hence we will plant many trees, many types of bushes, flower plant etc. for greenery

Design For Electric Supply Including Street Lighting

We have designed the system as per Local Electricity Board and consider centralized transformer, HT panel , Lt panel , Feeder Pillar and DG backup, Solar backupfor common service like external lighting.

Community Buildings

Swimming Pool with Restaurant is proposed for entire project

Treatment and Disposal System of Sewage and Sullage water

For treatment and disposal of sewage and sullage water a centralized sewerage system shall be provided with connecting to lines for each villa and common amenities as per sanctioned plan.

Solid Waste Management And Disposal System

For solid waste management and disposal system there will be well demarcated area for garbage collection and disposal system as per sanctioned plan.

Water Conservation System

A well designed Rain Water harvesting system shall be provided.

Energy Management System Including Use of Renewable Energy

We will use LED lights as well as solar lights in external areas.

Fire Protection And Fire Safety System

Since the development of villa is less than 50 meters in height, so all the fire norms shll be followed as per NBC and approval of the fire department.

Social Infrastructure And Other Public Amenities Including Public Health Services

Yoga and Meditation zone are commonly proposed for entire project.

Emergency Evacuation Services

N.A.

Other Miscellaneous Work

N.A.

Documents

Registry Document

No: 6103 | Date: 20-07-2016

Registry Document

No: 4736 | Date: 15-08-2021

Extract of Khatauni

No: 1427-32 | Date: -

Extract of Khatauni

No: 1427-32 | Date: -

Details of Encumbrances

Proforma of Completion Certificate(Occupancy)

Affidavit

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 26-08-2021

Commencement Certificate

Uploaded: 28-07-2021

Other Plan(If Any)

Uploaded: 02-09-2021

Proforma of Application Form

Uploaded: 29-07-2021

Proforma of Allotment Letter

Uploaded: 29-07-2021

Proforma of Conveyance Deed

Uploaded: 30-07-2021

Proforma of Completion Certificate(Occupancy)

Uploaded: 14-08-2021

Waste Disposal Plan

Uploaded: 30-07-2021

Water Supply Plan

Uploaded: 30-07-2021

Electricity Supply Plan

Uploaded: 30-07-2021

Development Work Plan

Uploaded: 30-07-2021

Affidavit

Uploaded: 03-09-2021

CA CERTIFICATE

Uploaded: 26-08-2021

ARCHITECT CERTIFICATE

Uploaded: 23-08-2021

ENGINEERS CERTIFICATE

Uploaded: 23-08-2021

Permits

Orignal Permit No117
Orignal Permit Date24-12-2020
Valid Upto23-12-2025
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto23-12-2028
End Date23-12-2025
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No117
Orignal Permit Date24-12-2020
Valid Upto23-12-2025
Revalidated Permit No117
Revalidated Permit Date24-12-2020
Revalidated Permit Valid Upto10-04-2026
Permit Extendable Upto10-04-2029
End Date23-12-2025
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No117
Orignal Permit Date24-12-2020
Valid Upto23-12-2025
Revalidated Permit No117
Revalidated Permit Date24-12-2020
Revalidated Permit Valid Upto10-04-2026
Permit Extendable Upto10-04-2029
End Date23-12-2025
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)SHAFAQAT ALI
Contractor AddressSector 16, House no. 1265, Indiranagar,Lucknow.
Architect NameMohd. Ashhad
Architect AddressThird Vendor Studios Pvt. Ltd. - Shop No. 10, Kisaan Bazaar, Vibhuti Khand, Gomti Nagar, Lucknow, Uttar Pradesh-226010
Architect Licence NumberCA/2012/58261
Structural Engineer NameChaudhari Mohammad Nadeem
Structural Engineer AddressSector 16 House no. 1265, Indira Nagar Lucknow
Mobile number(Project Co-ordinator)9919256789

Khasra Details

Total Area

57995.00

624252.38 ft²

2 plots
Khasra
TypeKhasra
Khasra/Plot No1166K
Area(In Sq. Mt.)29950
Khasra
TypeKhasra
Khasra/Plot No1226
Area(In Sq. Mt.)28045

Other Details

Contractor Name (if any)SHAFAQAT ALI
Contractor AddressSector 16, House no. 1265, Indiranagar,Lucknow.
Architect NameMohd. Ashhad
Architect AddressThird Vendor Studios Pvt. Ltd. - Shop No. 10, Kisaan Bazaar, Vibhuti Khand, Gomti Nagar, Lucknow, Uttar Pradesh-226010
Architect Licence NumberCA/2012/58261
Structural Engineer NameChaudhari Mohammad Nadeem
Structural Engineer AddressSector 16 House no. 1265, Indira Nagar Lucknow
Mobile number(Project Co-ordinator)9919256789