DEVELOPER WILL BE CONSTRUCTING 174 DUPLEXS OF DIFFERENT SIZES AS MENTIONED IN PLAN DETAILS ALONG WITH DEVELOPMENTS OF GARDENS AND OTHER EMENETIES. PLOTS WILL BE DEMARCATED AS PER SANCTIONED PLAN UPLOADED
BOUNDARY WALL WORK IS UNDER CONSTRUCTION AND WILL COVER THE FULL COLONY. THE COLONY WILL BE ONE GATED COLONY AND WILL BE FULLY BOUNDED
ROAD WILL BE CONSTRUCTED AS PER APPROVED MAP . BEST QUALITY MATERIAL WILL BE USED FOR CONSTRUCTION OF ROAD
FOOTPATHS WILL BE MADE AS PER REQUIREMENT
WATER WILL BE SUPPLIED THROUGH BORING AND GOVERMENT WATER SUPPLY FACILITY . THE LOCATION IS COVERED UNDER JAL JIVAN MISSION ALSO WHICH WILL BE EXTRA ADVANTAGE FOR THE COLONY
SEWER WILL BE CONSTRUCTED UNDERGROUND WHICH WILL BE LINKED WITH THE MAIN DUMPING POINT . IF REQUIRED STP ETP PLANTS WILL BE INSTALLED AS PER REQUIREMENT FOR RECYCLING OF WASTE MATERIAL
DRAIN SYSTEM WILL ALSO BE CONSTRUCTED AS PER SPECIFICATION PLAN
ALL THE PARKS WILL BE CONSTRUCTED AS PER SANCTION PLAN. THE COLONY WILL BE SURROUNDED BY TREES FOR BETTER LIVING
TREES WILL BE PLANTED ALL OVER THE COLONY FOR BETTER LIVING OF SOCIETY MEMBERS
DESIGN OF ELECTRICTY WILL BE DONE AS SPECIFIED BY ELECTRIC DEPARTMENT WILL BE QUALITY MATERIAL
COMMUNITY BUILDING WILL BE CONSTRUCTED AS PER SANCTION PLAN FOR GET TOGETHER OF SOCIETY MEMBERS
STP PLANTS WILL BE INSTALLED TO RE USE WASTE WATER IN PARKS
FOR SOLID WASTE MANAGEMENT THERE IS PROPER MARKED GARBAGE COLLECTION AREA AS PER SANCTIONED PLAN FOR SOLID WASTE MANAGEMENT AND DISPOSAL SYSTEM.
WATER CONSERVATION SYSTEM IS PROPOSED AND IT WILL BE CONSTRUCTED FOR GROUND WATER STORAGE.
NOT APPLICABLE
AS PER FIRE DEPARMENT AND NBFC NORMS THE HOUSES IS LESS THAN 30M OF HEIGHT, SO FIRE PROTECTION AND FIRE SAGETY WORK IS NOT APPLICABLE FOR THE PROJECT.
COMMERCIAL SHOPS WILL BE CONSTRUCTED AS PER SANCTION PLAN
NOT APPLICABLE AS DUPLEX HOUSE ARE CONSTRUCTED
N.A.
Total Area
50809.49 m²
546908.27 ft²