OngoingActive

SUPERTECH ORB-O AND B (PHASE-IV)

Gautam Buddha Nagar, Uttar Pradesh
01-08-2012
Launch Date
Ongoing
Type
29-06-2021
Completion Date

Overview

Launch Date

01-08-2012

Completion Date

29-06-2021

RERA ID

UPRERAPRJ7324

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)14157
Project NameSUPERTECH ORB-O AND B (PHASE-IV)
Registration Fee (in Rs.)76000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)107
DistrictGautam Buddha Nagar
Original Start Date01-08-2012
TehsilGautam Buddha Nagar
Proposed Start Date01-08-2012
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)43365
Proposed Completion Date29-06-2021

Location

Latitude

28.574266

Longitude

77.387420

Bank Details

Account no.510101003297140
Name Of Account HolderSUPERTECH LIMITED
Bank NameCORPORATION BANK
Branch AddressCORPORATION BANK , C-45 , SECTOR 62, NOIDA
Branch NameSECTOR 62
IFSC CodeCORP0001170

Development Works

Demarcation of Plots

As per approved building plans

Boundary Wall

As per approved building plans

Road Work

As per approved building plans

Footpaths

As per approved building plans

Water Supply Including Drinking Water Facilities

Water shall be provided by Authority & internal distribution shall be done by developer.

Sewer System

STP shall be provided for sewerage system.

Drain

Proper drainage system shall be provided

Parks

As per approved plans

Tree Planting

As per approved plans

Design For Electric Supply Including Street Lighting

As per approval from authority.

Community Buildings

As per approved building plans

Treatment and Disposal System of Sewage and Sullage water

STP shall be provided for sewerage system and treated water shall be used for flushing & irrigation system.

Solid Waste Management And Disposal System

Waste shall be segregated and will be treated by organic waste converter. Manure produced shall be used in green area and surplus effluent shall be disposed to authorized vendors.

Water Conservation System

Adequate nos of recharge pits shall be provided

Energy Management System Including Use of Renewable Energy

In common areas LED lights shall be provided with timer control.

Fire Protection And Fire Safety System

As per fire NOC

Social Infrastructure And Other Public Amenities Including Public Health Services

As per approved building plans

Emergency Evacuation Services

As per fire NOC

Other Miscellaneous Work

As per approved building plans

Documents

Lease Deed

No: 3988 | Date: 07-10-2010

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 06-07-2018

Commencement Certificate

Uploaded: 06-07-2018

Proforma of Application Form

Uploaded: 06-07-2018

Proforma of Allotment Letter

Uploaded: 06-07-2018

Proforma of Conveyance Deed

Uploaded: 06-07-2018

Waste Disposal Plan

Uploaded: 05-07-2018

Water Supply Plan

Uploaded: 05-07-2018

Electricity Supply Plan

Uploaded: 05-07-2018

Development Work Plan

Uploaded: 05-07-2018

Affidavit

Uploaded: 28-05-2019

CA CERTIFICATE

Uploaded: 28-05-2019

ARCHITECT CERTIFICATE

Uploaded: 06-07-2018

ENGINEERS CERTIFICATE

Uploaded: 06-07-2018

Registry Document In Case of Own Land

Uploaded: 31-07-2017

Registry Document In Case of Own Land

Uploaded: 27-12-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 27-12-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 27-12-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 27-12-2017

Authentic copy of Approval of Project

Uploaded: 27-12-2017

Details of Encumbrances

Uploaded: 27-04-2018

Permits

Orignal Permit No2014/III-227/757
Orignal Permit Date30-09-2014
Valid Upto30-09-2019
Revalidated Permit NoWILL BE APPLIED
Revalidated Permit Date30-09-2024
Revalidated Permit Valid Upto30-09-2024
Permit Extendable Upto30-09-2024
End Date30-12-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)B E BILLIMORIA PP SAHA
Contractor AddressSHAKALPURA GZB INDIA 201010
Architect NameVISHAL MITTAL Space Designers International
Architect AddressB-34 Sector 67 Noida UP
Architect Licence NumberCA/98/23185
Structural Engineer NameR D CHOUDHARY Vakil Mehta Sheth
Structural Engineer Address83/84, Sakhar Bhavan 230, Nariman Point MUMBAI-400021
Mobile number(Project Co-ordinator)8588033336

Land Details

AFS

Showing 2 blocks with 116 units

Property Summary

Total Carpet Area

41134.02 m²

442762.48 ft²

Total Units

326

2 different types

Blocks & Floors

2

34 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:126.18 m²
Balconies:273
Parking ratio:0.00 per unit

Block O AND B (PHASE-IV) -O

65 units

Block O AND B (PHASE-IV) -B

51 units

Khasra Details

Total Area

209271.47 m²

2252577.18 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH 01 A
Area(In Sq. Mt.)209271.47

Other Details

Contractor Name (if any)B E BILLIMORIA PP SAHA
Contractor AddressSHAKALPURA GZB INDIA 201010
Architect NameVISHAL MITTAL Space Designers International
Architect AddressB-34 Sector 67 Noida UP
Architect Licence NumberCA/98/23185
Structural Engineer NameR D CHOUDHARY Vakil Mehta Sheth
Structural Engineer Address83/84, Sakhar Bhavan 230, Nariman Point MUMBAI-400021
Mobile number(Project Co-ordinator)8588033336