Launch Date
Completion Date
RERA ID
26.54166
81.06291
THE PLOTS WILL BE WELL DEMARCATED BY PLACING IRON ANGELS ON ALL FOUR CORNERS OF EACH PLOT SO THAT THEY CAN BE EASILY IDENTIFIED AND THAT A SIGN BOARD WITH THE PLOT NUMBER SHALL BE PUT UP ON THE FRONT OF EACH PLOT WITH THE DIMENSIONS AREA AND SIZE.
BOUNDARY WALL WILL BE PROVIDED WITH BRICK WORK UPTO 1.2M ALONG WITH M.S GRILL UPTO 0.6M HT BIFURCATING THE PHASE II ONLY NOT ON ANY OTHER SIDE OF THE PLOT.
12MTS ROAD WITH CENTRAL BITUMIN FINISH AND SOFT PAVEMENTS ON BOTH SIDES OF ROAD SHALL MADE ON EASTERN SIDE 18MTR WIDE ROAD WITH CENTRAL BITUMIN FINISHED AND SOFT PAVEMENTS ON BOTH SIDES SHALL BE MADE ON NORTH SIDE.
THERE WILL BE FOOTPATH ALONG BOTH THE ROADS.
WATER SUPPLY TO INDIVIDUAL PLOT WILL BE THROUGH PROPOSED 80MM.
250MM PIPE WITH CHAMBER AT JUNCTION OF TWO PLOTS IS TO BE PROVIDED. THIS SEWER LINE SHALL BE CONNECTED WITH THE EXISTING MUNICIPAL SEWAGE LINE.
DRAIN ALONG THE MAIN ROAD SHALL BE PROVIDED WITH PROPER SLOPE.
PARK SHALL BE DEVELOPED WITH STRUCTURED GREEN AREA.
TREE ALONG THE ROAD AND ONE TREE IN THE FRONT SIDE OF EACH PLOT SHALL BE PLANTED.
ELECTRICITY POLES WITH LT CONNECTION AND STREET LIGHT SHALL BE ERRECTED ALONG THE ROAD SO THAT PLOT HOLDER CAN GET EASY CONNECTION.
A CLUB IS PROVIDED IN THE PROJECT.
NA
NA
PROPER GUIDELINES WILL BE FOLLOWED FOR CONSERVATION OF NATURAL WATER.
NA
NA
PROPER PROVISION FOR SOCIAL INFRA AND PUBLIC AMENITIES PROVIDED.
NA
NA
Showing 1 blocks with 3 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
12664.66 m²