NewActive

SKA ORION

Gautam Buddha Nagar, Uttar Pradesh
01-03-2021
Launch Date
New
Type
31-03-2026
Completion Date

Overview

Launch Date

01-03-2021

Completion Date

31-03-2026

RERA ID

UPRERAPRJ186008

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)13458
Project NameSKA ORION
Registration Fee (in Rs.)72500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)61
DistrictGautam Buddha Nagar
Original Start Date-
TehsilGautam Buddha Nagar
Proposed Start Date01-03-2021
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)31000
Proposed Completion Date31-03-2026

Location

Latitude

29.2957

Longitude

77.2519

Bank Details

Account no.50530638968
Name Of Account HolderPROVENCE DEVELOPERS PVT LTD
Bank NameALLAHABAD BANK
Branch AddressE-1, Gaur Green Avenue, Abhay Khand-2, Indirapuram
Branch NameINDIRAPURAM
IFSC CodeALLA0212759

Development Works

Demarcation of Plots

The plot demarcation will be done with temporary GI sheet

Boundary Wall

Boundary wall of RCC and brick work will be constructed

Road Work

Pavers, Tiles and Trimix concrete will be used in Roads of the project

Footpaths

In footpaths Pavers and stone will be used

Water Supply Including Drinking Water Facilities

The water supply is provided by NOIDA , its distribution with in project will be done with Pvc and GI pipes

Sewer System

The External sewer system is provided by Noida. The sewer system with in the complex will be develop with RCC/DMC pipes.

Drain

The external Drainage system is provided by NOIDA . The internal drains will be develop with cover drains

Parks

The parks with in complex will be develop will be with Grass plants , various trees like Ashok , Gulmohar ,champa and Scholar etc

Tree Planting

More then 105 trees like Ashoka, Gulmohar Champa Scholar Semal and Chorasia will be planted

Design For Electric Supply Including Street Lighting

The electric supply system will be designed as per norms of UPPCL.The power load is 1750 Kva

Community Buildings

Community hall with Gym and billiard room will be provided for residents.

Treatment and Disposal System of Sewage and Sullage water

A STP of 212 KLD will be provided for treatment of sewer.and reusing it in flushing and landscaping purposes.

Solid Waste Management And Disposal System

The waste will be segregated and disposed as per solid waste management rules through approved agency

Water Conservation System

1) Treated waste water will be used in flushing purposes to reduce fresh water requirment2) Rain water harvesting will be installed for conserving rain water3) Low flow bath room fixtures will be used for saving water

Energy Management System Including Use of Renewable Energy

We will install roof top solar system for basement common lighting . LED lights will be used for common area lighting for energy saving.

Fire Protection And Fire Safety System

The fire protection and fire safety system will be installed as fire norms of fire department

Social Infrastructure And Other Public Amenities Including Public Health Services

In public area facilities like Gym ,TT ,sitting area , walking pathway and pray room etc will be provided

Emergency Evacuation Services

The Emergency Evacuations provision will be provided as per norms

Other Miscellaneous Work

This project will be provided with facilities like club , pray room, parks and swimming pool for residents

Documents

Lease Deed

No: 2487 | Date: 22-06-2020

Allotment Letter issued by Competent Authority

No: 1506 | Date: 27-04-2020

Details of Encumbrances

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 20-02-2021

Commencement Certificate

Uploaded: 05-02-2021

Other Plan(If Any)

Uploaded: 05-02-2021

Proforma of Application Form

Uploaded: 05-02-2021

Proforma of Allotment Letter

Uploaded: 05-02-2021

Proforma of Conveyance Deed

Uploaded: 25-02-2021

Proforma of Completion Certificate(Occupancy)

Uploaded: 05-02-2021

Waste Disposal Plan

Uploaded: 05-02-2021

Water Supply Plan

Uploaded: 05-02-2021

Electricity Supply Plan

Uploaded: 05-02-2021

Development Work Plan

Uploaded: 05-02-2021

Affidavit

Uploaded: 23-02-2021

CA CERTIFICATE

Uploaded: 23-02-2021

ARCHITECT CERTIFICATE

Uploaded: 23-02-2021

ENGINEERS CERTIFICATE

Uploaded: 23-02-2021

Permits

Orignal Permit NoNOIDA/CTP/2021-III/2006/1183
Orignal Permit Date02-02-2021
Valid Upto02-02-2026
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto02-02-2028
End Date31-03-2026
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Mr Suresh Gupta
Contractor AddressM/s Radha buildtech Pvt Ltd 4/2885, Gali no-1, Bihari colony, Shahdara, Delhi-32
Architect NameKailash Aggrawal
Architect AddressJ-16,SECTOR-41,NOIDA,U.P
Architect Licence NumberCA-86-10069
Structural Engineer NameR D Choudhary
Structural Engineer AddressB-1102, VASUNDHARA, DOSTI VIHAR, VARTAK NAGAR, THANE WEST, MAHARASHTRA
Mobile number(Project Co-ordinator)9999557711

Land Details

AFS

Showing 4 blocks with 222 units

Property Summary

Total Carpet Area

47265.28 m²

508758.75 ft²

Total Units

531

3 different types

Blocks & Floors

4

35 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:89.01 m²
Balconies:623
Parking ratio:0.00 per unit

Block GAMMA

131 units

Block ALPHA

38 units

Block BETA

38 units

Block COMMERCIAL

15 units

Khasra Details

Total Area

13457.92 m²

144859.71 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH-01A/2, SEC-143B
Area(In Sq. Mt.)13457.92

Other Details

Contractor Name (if any)Mr Suresh Gupta
Contractor AddressM/s Radha buildtech Pvt Ltd 4/2885, Gali no-1, Bihari colony, Shahdara, Delhi-32
Architect NameKailash Aggrawal
Architect AddressJ-16,SECTOR-41,NOIDA,U.P
Architect Licence NumberCA-86-10069
Structural Engineer NameR D Choudhary
Structural Engineer AddressB-1102, VASUNDHARA, DOSTI VIHAR, VARTAK NAGAR, THANE WEST, MAHARASHTRA
Mobile number(Project Co-ordinator)9999557711