Launch Date
Completion Date
RERA ID
27.495502
27.493960
Demarcation of Plot line with prefabricated RCC muddy on all four corner of plots.
Wall in brick massonary with FPS bricks of class designation 75 in ratio of 1-6 cement mortar on RCC footing and coloum structure.
Laying of Roads with proper longitudinal and cross-sectional road slopes in bitumen over well compacted subgrade with 75 mm or more layers of GSB as per requirement.
Laying of interlocking pavers of 40 mm over well compacted subgrade with GSB layers.
Laying of fresh water supply line from underground tank to individual plots with proper air valve, sluice valve in chambers, scour valve, and fire bridage outlet connection at underground tank as per MEP drawings.
Laying of DWC pipes and making of circular Manholes and rectangular manhole of required size eg. ( 600/600 mm) for main line with proper finished formation level, Invert level of Manhole and connection to individual plots as per MEP drawings.
Laying of DWC/RCC pipes for storm water drainage throughout the projects with circular manholes and rectangular catch Basins size 450/450/450 for individual plots (in plot owner scope), de silting chambers of dia 1.5M and recharge well size 1.2 dia in coordination with finished formation levels, invert level of manhole and flow rate as per MEP drawings.
Landscaping of parks with plantation including trees, Shrubs and ground covers and recreational areas with benches, sport facilities.
Tree plantation of Plumeria Alba (Champa) and Palm trees throughout the projects in parks and on roadside to provide shade as per landscape drawings.
Laying of overhead LT and HT cables from Main electricity board connection to transformers and up to plots for individual connections (which shall be directly obtained by the plot owners from the electricity board) along with fixing of 30W /50W street lights on 9m /11m steel tubular poles with provision of required capacity transformers as per UPPCL guidelines
NA
Construction of STP collection tank along with modular treatment system and laying of DWC Pipes from STP to individual plots and green areas for flushing and irrigation as per MEP drawings and overflow discharge connected to the government drain.
Construction of Garbage rooms in bricks load bearing structure with dustbins. collection room and loading area.
Installation of Rain Water Harvesting pits for percolation of rain water to maintain the local ground water levels as per approved layout from MVDA and laying of sewage treated water supply line to plots and green areas for flushing and irrigation as per MEP drawings.
NA
NA
NA
NA
Earth dressing work, construction of Garbage area
No: Non Encumbrance Certificate | Date: 19-08-2021
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
136138.84 m²
1465384.86 ft²