OngoingActive

Shri Radha Aqua Gardens

Gautam Buddha Nagar, Uttar Pradesh
01-08-2016
Launch Date
Ongoing
Type
29-10-2023
Completion Date

Overview

Launch Date

01-08-2016

Completion Date

29-10-2023

RERA ID

UPRERAPRJ7477

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)20121
Project NameShri Radha Aqua Gardens
Registration Fee (in Rs.)106000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)87
DistrictGautam Buddha Nagar
Original Start Date01-08-2016
TehsilGautam Buddha Nagar
Proposed Start Date01-08-2016
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)28800
Proposed Completion Date29-10-2023

Location

Latitude

28 36 37.05

Longitude

77 27 2.82

Bank Details

Account no.081605006635
Name Of Account HolderDecent Buildwell Pvt. Ltd.
Bank NameICICI Bank
Branch AddressSector 63, Noida
Branch NameSector 63, Noida
IFSC CodeICIC0000816

Development Works

Demarcation of Plots

Not Applicable

Boundary Wall

RCC and Brick Work with wire fencing.

Road Work

6 M Wide Roads with Paved Surface and Paved

Footpaths

Landscapeed /paved Pathways

Water Supply Including Drinking Water Facilities

Potable water supplied by Municipal Authority stored in underground and overhead tanks provided on top of each tower

Sewer System

Sewage system provided with adequate capacity of STP for treatment of effluents

Drain

Surface Drainage system provided with provision of harvesting rainwater from building terrace

Parks

adequate no. of Parks provided in central landscapped area with shading trees, pathways & Kids play area along with water bodies

Tree Planting

Native tree plantation as per gold rated green building standards by IGBC provided in central area as well as periphery of the plot

Design For Electric Supply Including Street Lighting

HT & LT Electric supply as per load demand of the complex provided with meter room, Transformers, HT Panel, LT Panel along with adequate DG Sets for power backup

Community Buildings

Cetral Club/ Community building provided wth facility for indoor games , Gymnasium and swimming pool etc

Treatment and Disposal System of Sewage and Sullage water

Sewage Treatment plant of adequate capacity provided in basement area for effluents. Water discharged from Plant used for landscaping/horticuture

Solid Waste Management And Disposal System

Door to door collection of Solid waste planned along with engagement of specialized agency for disposal of all collected solid waste

Water Conservation System

Water conservation measures as per Gold rated Green Building standards proposed such as installation of Irrigation system, Low flow fixtures etc

Energy Management System Including Use of Renewable Energy

Renewable energy usage proposed in common area as per Gold rated Green building standards with Solar PV generation or Solar water Heating syatems.

Fire Protection And Fire Safety System

Fire Hose Reels, Fire alarm system, Sprinklers, fire Extinguishers provided in each building satisfying all fire norms

Social Infrastructure And Other Public Amenities Including Public Health Services

Commercil area along with central club provided as social amenties

Emergency Evacuation Services

Emergency exits, fire exits provided in each tower at ground floor with adequate signages.

Other Miscellaneous Work

Not Applicable

Documents

Lease Deed

No: 5864 | Date: 21-03-2016

Other Plan(If Any)

Proforma of Application Form

Proforma of Allotment Letter

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Waste Disposal Plan

Water Supply Plan

Electricity Supply Plan

Affidavit

Details of Encumbrances

Uploaded: 29-07-2018

Commencement Certificate

Uploaded: 25-07-2018

Development Work Plan

Uploaded: 30-07-2018

CA CERTIFICATE

Uploaded: 31-07-2018

ARCHITECT CERTIFICATE

Uploaded: 31-07-2018

ENGINEERS CERTIFICATE

Uploaded: 02-08-2018

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 31-07-2017

Registry Document In Case of Own Land

Uploaded: 31-07-2017

Proforma of Application Form

Uploaded: 31-07-2017

Proforma of Allotment Letter

Uploaded: 31-07-2017

Proforma of Conveyance Deed

Uploaded: 31-07-2017

Waste Disposal Plan

Uploaded: 31-07-2017

Water Supply Plan

Uploaded: 31-07-2017

Electricity Supply Plan

Uploaded: 31-07-2017

Other Plan(If Any)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Affidavit

Uploaded: 31-07-2017

Permits

Orignal Permit NoLetter No. PLG(BP) 3608/69 Dated 22-12-2016
Orignal Permit Date22-12-2016
Valid Upto21-12-2021
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto21-12-2026
End Date31-07-2021
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit NoPLG(BP) 3608/69
Orignal Permit Date22-12-2016
Valid Upto21-12-2021
Revalidated Permit NoPLG(BP) 3608/69
Revalidated Permit Date22-12-2016
Revalidated Permit Valid Upto21-12-2026
Permit Extendable Upto21-12-2026
End Date29-10-2023
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit NoNIYO/2024/BP-3608/1534
Orignal Permit Date22-12-2016
Valid Upto21-12-2021
Revalidated Permit NoNIYO/2024/BP-3608/1534
Revalidated Permit Date22-12-2016
Revalidated Permit Valid Upto01-01-1900
Permit Extendable Upto21-12-2026
End Date29-10-2023
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)M/s Progressive Buildcon Pvt. Ltd.
Contractor AddressH-20, Sector 63, Noida
Architect NameM/s Confluence (Mr. Vishal Sharma)
Architect AddressB-21, New Friends Colony, New Delhi
Architect Licence NumberCA/1998/23261
Structural Engineer NameM/S Mehro Consultants
Structural Engineer AddressA-1/36, Safdarjung Enclave, New Delhi
Mobile number(Project Co-ordinator)9810751856

Land Details

AFS

Showing 6 blocks with 446 units

Property Summary

Total Carpet Area

60615.26 m²

652456.60 ft²

Total Units

972

4 different types

Blocks & Floors

6

24 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:62.36 m²
Balconies:1734
Parking ratio:0.00 per unit

Block CASCADE

87 units

Block COMMERCIAL

16 units

Block FONTANE

72 units

Block LAGOON

73 units

Block NLV

99 units

Block SLV

99 units

Khasra Details

Total Area

20121.00 m²

216580.43 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH-05A, Sector 16B, Greater Noida
Area(In Sq. Mt.)20121

Other Details

Contractor Name (if any)M/s Progressive Buildcon Pvt. Ltd.
Contractor AddressH-20, Sector 63, Noida
Architect NameM/s Confluence (Mr. Vishal Sharma)
Architect AddressB-21, New Friends Colony, New Delhi
Architect Licence NumberCA/1998/23261
Structural Engineer NameM/S Mehro Consultants
Structural Engineer AddressA-1/36, Safdarjung Enclave, New Delhi
Mobile number(Project Co-ordinator)9810751856