Plot Boundaries are marked as per layout, all plot boundaries and building block boundaries are marked.
Boundary wall of all side are constructing in Frame Structure with Brick work, Distance of 1.5 meter span placing columns and filling with Brick work, finish with Plaster.
NA
NA
Water Supply and pipings on site level and building block level are fitting. Drinking water facility providing on each floor as per defined in drawings.
Sewer System, Tanks and Drainage Pipes are installed on Site setback and connected with Gutter, Single Track Sewerage System is installed in Building Block .
Drain, Single Track System is installed in Drainage on Building Block level, also establish required Pits around the blocks.
NA
Tree Plantation will be execute as per Site layout and on ground level as per design.
Design For Electricals supply as per supply pattern floor wise , each shop having electrical tap point and separate electricity point.
NA
NA
Solid waste disposal and management system is installing as per drawings.
INCORPORATED ON IN DESIGN TO BE EXECUTE AS PER DRAWING , Water tanks are preparing and stored water use in Toilets and fire safety syatam.
AS PER SPECIFICATION
As per Fire safety provisions NOC and Drawings, Installing the pipelines and other fire safety fixtures
NA
FIRE EXISTS AS PLACED AS PER FIRE DEPARTMENT NOC
NA
Showing 1 blocks with 12 units
Total Carpet Area
2809.47 m²
30240.85 ft²
Total Units
12
1 different types
Blocks & Floors
1
3 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
2922.18 m²
31454.05 ft²