NewActive

SAWASDEE STREET

Ghaziabad, Uttar Pradesh
01-02-2021
Launch Date
New
Type
31-12-2024
Completion Date

Overview

Launch Date

01-02-2021

Completion Date

31-12-2024

RERA ID

UPRERAPRJ830180

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)3617
Project NameSAWASDEE STREET
Registration Fee (in Rs.)47000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)47
DistrictGhaziabad
Original Start Date-
TehsilGhaziabad
Proposed Start Date01-02-2021
Sanctioning Competent AuthorityGhaziabad Development Authority
Project Cost (in Lacs)4960
Proposed Completion Date31-12-2024

Location

Latitude

28.7066

Longitude

77.4359

Bank Details

Account no.081605011295
Name Of Account HolderRIVIERA BUILDTECH PVT LTD - RERA SEPARATE ACCOUNT
Bank NameICICI BANK
Branch AddressSECTOR 63 NOIDA
Branch NameSECTOR SIXTY THREE NOIDA
IFSC CodeICIC0000816

Development Works

Demarcation of Plots

KHASRA NO 1205 VILLAGE NOOR NAGAR PARGNA , LONI, TEHSIL AND DISTRICT GHAZIABAD

Boundary Wall

AS PER THE CONSTRUCTION WE WILL DO 2 SITES ADJOINING BOUNDARY WALL WITH OTHER OCCUPANT

Road Work

AS PER AUTHORITY GUIDELINES WE WILL DO CEMENT CONCRETE INTERNAL ROAD WORK

Footpaths

AS PER THE AUTHORITY GUIDELINE WE WILL USE INTERLOCKING PAVER

Water Supply Including Drinking Water Facilities

MUNICIPAL WATER SUPPLY WILL BE USED AND STORAGE WILL BE DONE UNDERGROUND WATER TANK

Sewer System

AS PER AUTHORITY GUIDELINES NORMS WE WILL PLACE AND INSTALL THE MAIN SEWER IN THE PROJECT

Drain

AS PER THE AUTHORITY MAP GUIDELINE UNDERGROUND PIPE DRAIN WITH CHAMBER WILL BE INSTALLED

Parks

DESIGNED AS PER SANCTIONED MAP AND AUTHORITY GUIDELINES

Tree Planting

TREE PLANTING HAS BEEN DESIGNED AS PER AUTHORITY GUIDELINES AND WILL BE INSTALLED

Design For Electric Supply Including Street Lighting

AS PER UTTAR PRADESH POWER CORPORATION LIMITED GUIDELINES DESIGN FOR ELECTRICAL SUPPLY WILL BE MADE.

Community Buildings

N/A

Treatment and Disposal System of Sewage and Sullage water

AS PER THE AUTHORITY GUIDELINES PROVIDED FOR THE TREATMENT AND DISPOSAL SYSTEM SEWAGE AND SULLAGE WATER ARRANGEMENT WILL BE MADE IN THE PROJECT AND STP 115 KLD WILL BE SUITABLY INSTALLED

Solid Waste Management And Disposal System

DOOR TO DOOR COLLECTION OF THE SOLID WASTE WILL BE MADE

Water Conservation System

RECYCLING OF TREATED WATER AND ARRANGEMENT WILL BE MADE FOR RAIN WATER SYSTEM

Energy Management System Including Use of Renewable Energy

LED LIGHT WILL BE PROVIDED AT SUITABLE PLACES

Fire Protection And Fire Safety System

AS PER FIRE DEPARTMENT GUIDELINES DESIGN AND DEVELOPMENT OF FIRE PROTECTION AND FIRE SAFETY SYSTEM WILL BE INSTALLED

Social Infrastructure And Other Public Amenities Including Public Health Services

AS PER AUTHORITY GUIDELINES SOCIAL INFRASTRUCTURE AND OTHER PUBLIC AMENITIES INCLUDING PUBLIC HEALTH SERVICES.

Emergency Evacuation Services

NECESSARY ARRANGEMENT WILL BE MADE AS PER SANCTIONED PLAN AND THE GUIDELINE PROVIDED BY THE AUTHORITY WE WILL HAVE EMERGENCY EVACUATION SERVICES.

Other Miscellaneous Work

N/A

Documents

Sale Deed

No: REGISTRATION NO 515 IN BAHI NO 1 JILD NO 3361 ON PAGES NO 42 TO 124 WITH SUB REGISTRAR (II) GHAZIABA | Date: 29-01-2009

Extract of Khatauni

No: 1427-1432, 1415-1420 | Date: -

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 08-03-2021

Commencement Certificate

Uploaded: 08-03-2021

Other Plan(If Any)

Uploaded: 08-03-2021

Proforma of Application Form

Uploaded: 08-03-2021

Proforma of Allotment Letter

Uploaded: 08-03-2021

Proforma of Conveyance Deed

Uploaded: 08-03-2021

Waste Disposal Plan

Uploaded: 03-04-2021

Water Supply Plan

Uploaded: 03-04-2021

Electricity Supply Plan

Uploaded: 03-04-2021

Development Work Plan

Uploaded: 03-04-2021

Affidavit

Uploaded: 03-04-2021

CA CERTIFICATE

Uploaded: 08-03-2021

ARCHITECT CERTIFICATE

Uploaded: 08-03-2021

ENGINEERS CERTIFICATE

Uploaded: 08-03-2021

Permits

Orignal Permit No3736/MPLAN/ZONE-1/2020
Orignal Permit Date16-12-2020
Valid Upto16-12-2025
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto16-12-2025
End Date31-12-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)RIVIERA BUILDTECH PVT. LTD.
Contractor AddressH-175, SECTOR-63, NOIDA
Architect NameANUJ AGARWAL ARCHITECTS
Architect AddressA-22 KAUSHAMBI GHAZIABAD
Architect Licence NumberCA/96/19503
Structural Engineer NameGULAM SARWAR
Structural Engineer AddressKEEN ASSOCIATES PVT LTD 1ST FLOOR H-53, OPPO VIJAY BANK SECTOR -63 NOIDA U.P.
Mobile number(Project Co-ordinator)9643326973

Land Details

AFS

Showing 1 blocks with 53 units

Property Summary

Total Carpet Area

5847.52

62942.12 ft²

Total Units

73

2 different types

Blocks & Floors

1

10 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:80.10
Balconies:0
Parking ratio:0.00 per unit

Block A

53 units

Khasra Details

Total Area

5117.10

55079.95 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No1205
Area(In Sq. Mt.)5117.1

Other Details

Contractor Name (if any)RIVIERA BUILDTECH PVT. LTD.
Contractor AddressH-175, SECTOR-63, NOIDA
Architect NameANUJ AGARWAL ARCHITECTS
Architect AddressA-22 KAUSHAMBI GHAZIABAD
Architect Licence NumberCA/96/19503
Structural Engineer NameGULAM SARWAR
Structural Engineer AddressKEEN ASSOCIATES PVT LTD 1ST FLOOR H-53, OPPO VIJAY BANK SECTOR -63 NOIDA U.P.
Mobile number(Project Co-ordinator)9643326973