Launch Date
Completion Date
RERA ID
27'53'50.74' (N)
78'07'45.59' (E)
The project is situated nearby city, on the front side another project is running, and other sides of the project have vacate land
We will sold the independent plot to the owner and we will recommend to the owner to make the boundary wall with Brick work and RCC and tiles.
Road work will be made of Concrete Cement of good Quality
Footpath will be made of Paver Bricks
For Water Supply for some construction activity we have fixed bore well on the project, and for drinking water i have make arrangement form outside vendors for good quality Drinking water for labour staff.
A good Quality Sewerage System to be developed before finalization of the Projects
For drain we will use good quality PVC Pipes
There will be good parks spaces at the various places of this projects to maintain the good environment for the human,
Green Tree planting will be fixed at the verious place of this projects.
Electric Supply will be from UPPCL and design will be as per Electricity Supply plan of this projects and we will use best quality street lights on this projects
There is no community building in this projects however the small place for waiting will be there.
For the Treatment of the Disposal Sewerage we will use a good rating outside vendors for cleaning and for Sullage water we will fixed good quality water purifier.
For solid waste management and disposal we will use outside good rating vendors
For drinking water conversation we will use Security guard at Drinking water point and use signage for save water at every point,
Energy management for energy saving we will use LED and low power consumption equipment’s at the projects
There is no need to fix fire system on the plots however A good Quality fire safety system will be used at the site office of the project and we regularly checked at appropriate interval, also the fire extinguisher will be established at office,
On the Projects site various banner/signage will be established to save/ aware to the human for life safety.
There is no need to established Emergency Evacuation Services
Other all work will be done with the help of best quality equipments at the projects
No: (AMENDED 1/9666 PAGE NO-195 TO 206/10427) (ORIGINAL 1/9421 PAGE NO-255 TO 286/6023 | Date: 25-08-2012
No: (AMENDED 1/9666 PAGE NO-179 TO 186/1072) (ORIGINAL 1/9406 PAGE NO-235 TO 248/5728 | Date: 25-08-2012
Total Area
98974.41 m²
1065350.65 ft²