Launch Date
Completion Date
RERA ID
25.475375
78.569192
Plots to be physically demarked on site by marking all corners of plot
NA
Existing 9 meter CC road to be used
Existing 1 meter paver block pavement to be used
HDPE pipe line of required dia to be laid underground
non-pressure (NP2) RCC socket and spigot pipes laid to gradient. Manholes and inspection chambers as per gradient of required sizes.
Surface water to be drained through drain channels provided as per calculations.
NA
10
Providing electric line for 11 KV Line, Installation of Transformer, Cables for power distribution, MCCB etc. as per Electricity Board Norms.
NA
Sewer Lines to be connected to existing sewer disposal system.
Designated area to be installed with garbage disposal bins with proper segregation.
Water Harvesting pits in brick masonary as per design.
NA
NA
NA
NA
NA
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
2892.39 m²
31133.40 ft²