Launch Date
Completion Date
RERA ID
28.943746
28*56'37.4856'N
Plot boundries already demarcated.
Brick work boundry wall of 8 ft. height all around the periphery already done.
Cobles on road are already done
Cobles are used for Footpath.
For water supply, water tanks on roof is already done.
Under ground system. Feeder pipeline of PVC and final discharge through RCC pipes.
Storm water is going to harvesting recharge pits. Excess water if any, will be discharge to authority drain.
Park of 1005 Sq. Mtr. Is provided in the township.
Plantation of above 300 plants is already done.
HT line has been taken from UPPVNL converted to LT supply with in house transformers and switching system. Street lights are LED based.
TT, Biliards and other kids recreation facilities already provided.
Raw sewerage will be processed through STP of 72 KL capacity. Treated water shall be used for flushing, irrigation and cleaning purpose as much as feasiable. Excess water shell be discharge in the authority drain
Waste shall be manually handle for disposal.
Harvesting recharge pits are used. Treated water shall be used for flusing, irrigation and cleaning purpose as much as fessiable.
NA
Fire hydrant is provided. Fire alarm system, sprinkler and fire extinguisher is provided as required.
NA
Fire tender route and refused area is provided. Emergency stairs are provided as approved by fire department.
Nil as on date.
Showing 2 blocks with 32 units
Total Carpet Area
13791.04 m²
148445.38 ft²
Total Units
104
3 different types
Blocks & Floors
2
13 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
6700.00 m²
72118.13 ft²