NewActive

Paras Ramayana

Prayagraj, Uttar Pradesh
11-09-2020
Launch Date
New
Type
10-09-2025
Completion Date

Overview

Launch Date

11-09-2020

Completion Date

10-09-2025

RERA ID

UPRERAPRJ577368

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)4720
Project NameParas Ramayana
Registration Fee (in Rs.)29000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)60
DistrictPrayagraj
Original Start Date-
TehsilPhulpur
Proposed Start Date11-09-2020
Sanctioning Competent AuthorityAllahabad Development Authority
Project Cost (in Lacs)3200
Proposed Completion Date10-09-2025

Location

Latitude

25.426853

Longitude

81.636613

Bank Details

Account no.00640200002427
Name Of Account HolderTriveni Buildzone Private Limited
Bank NameBank of Baroda
Branch AddressBank of Baroda Main Branch MG Road Allahabad 211001
Branch NameMG Marg Allahabad
IFSC CodeBARB0ALLAHA

Development Works

Demarcation of Plots

We have one plot of size 4720 sq. mtr. having 1 main entrance gate from the 60 m wide front road.

Boundary Wall

2.5 m high and Brick work and RCC work in column and beam.

Road Work

From the main entrance gate we have 60 mm thick interlocking brick/RCC road throughout the project whose wideness is 13 mts. approx.

Footpaths

The project consists of roads only and no footpath is being provided.

Water Supply Including Drinking Water Facilities

We will provide two nos. of pump for the requirement of blocks through underground pipelines

Sewer System

Modular Sewerage system shall be provided. All sewerage water shall go to the STP and overflow from the STP shall be connect with the Municipal Sewerage system . when come into force

Drain

Storm water shall be provided. Storm water from Roads and other landscape area shall be connect to the storm water drain channel and go to the Rain Water Harvesting pit for recharge the ground water and overflow shall be connect with municipal drain line.

Parks

We will provide green area with the different activities and the green area will have gaming facilities for kids.

Tree Planting

We will provide many type of trees all along the boundary wall and green area

Design For Electric Supply Including Street Lighting

We will design and implement the system as per local electricity board and will contain centralized Transformer , HT panel , LT panel ,Feeder Pillar and DG back for common service like External lighting Fountain, STP, Pump room etc.

Community Buildings

Community hall of 176 sq. mtr. is provided having Gym facility and club house

Treatment and Disposal System of Sewage and Sullage water

Modular Sewerage system shall be provided. All sewerage water shall be go to the STP and overflow from the STP shall be connect with the municipal sewerage system when come in force.

Solid Waste Management And Disposal System

There is a proper garbage collection area provided for the solid waste management

Water Conservation System

We will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in the external area . In pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use the energy efficient lights.

Fire Protection And Fire Safety System

This project has only residential flats. Hence we will provide fire fighting facility in common areas while individual owner can install there own system as per there local authorities requirement.

Social Infrastructure And Other Public Amenities Including Public Health Services

The same is not being provided in the project

Emergency Evacuation Services

We have proposed common pump room. All sewerage shall be go to the STP. Road sand other area shall be connect to the storm water drain channel and go to the rain water

Other Miscellaneous Work

Convenient shops will be provided in the project

Documents

Registry Document

No: 7059 | Date: 31-07-2019

Registry Document

No: 7053 | Date: 26-11-2018

Extract of Khatauni

No: 1426-1431 | Date: -

Extract of Khatauni

No: Reply to query letter | Date: -

Sale Deed

No: 9814 | Date: 09-12-2020

Extract of Khatauni

No: Reply to query letter dated 08.12.2020 | Date: -

Proforma of Completion Certificate(Occupancy)

CA CERTIFICATE

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 06-11-2020

Commencement Certificate

Uploaded: 06-11-2020

Other Plan(If Any)

Uploaded: 04-12-2020

Proforma of Application Form

Uploaded: 06-11-2020

Proforma of Allotment Letter

Uploaded: 06-11-2020

Proforma of Conveyance Deed

Uploaded: 06-11-2020

Waste Disposal Plan

Uploaded: 06-11-2020

Water Supply Plan

Uploaded: 06-11-2020

Electricity Supply Plan

Uploaded: 06-11-2020

Development Work Plan

Uploaded: 06-11-2020

Affidavit

Uploaded: 06-11-2020

CA CERTIFICATE

Uploaded: 20-11-2020

ARCHITECT CERTIFICATE

Uploaded: 20-11-2020

ENGINEERS CERTIFICATE

Uploaded: 20-11-2020

Permits

Orignal Permit No104-Pre.Aa.(Ta.Sha.)Zone-5-Group housing-2019-20
Orignal Permit Date11-09-2020
Valid Upto10-09-2025
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto10-09-2028
End Date10-09-2025
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Deen Bandhu Shaw
Contractor Address35, Ground Floor, Pushpendra Apartment , Elgin Road , Prayagraj
Architect NameManish Gujral
Architect Address52/25B, Muir Road , Prayagraj
Architect Licence NumberCA/97/21380
Structural Engineer NameDr Santosh Kumar
Structural Engineer AddressVAM Consulting Engineers and Architects (P) Ltd 7/121(B), Swaroop Nagar , Kanpur
Mobile number(Project Co-ordinator)7705877058

Land Details

AFS

Showing 1 blocks with 178 units

Property Summary

Total Carpet Area

12994.24 m²

139868.70 ft²

Total Units

178

4 different types

Blocks & Floors

1

14 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:73.00 m²
Balconies:524
Parking ratio:0.00 per unit

Block A

178 units

Khasra Details

Total Area

4720.00 m²

50805.61 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No657
Area(In Sq. Mt.)4720

Other Details

Contractor Name (if any)Deen Bandhu Shaw
Contractor Address35, Ground Floor, Pushpendra Apartment , Elgin Road , Prayagraj
Architect NameManish Gujral
Architect Address52/25B, Muir Road , Prayagraj
Architect Licence NumberCA/97/21380
Structural Engineer NameDr Santosh Kumar
Structural Engineer AddressVAM Consulting Engineers and Architects (P) Ltd 7/121(B), Swaroop Nagar , Kanpur
Mobile number(Project Co-ordinator)7705877058