Launch Date
Completion Date
RERA ID
28.708116
77.432616
Demarcation of Plot already done as it a plot/ part of approved layout/plotted development "Palm Drive".
RCC pillar with 230 mm thick exposed Brick Wall of height 1 mt.
Front approach road work done as it is a plot/part of approved layout/plotted development "Palm Drive"
Cement, concrete Interlocking Pavers laid on PCC bed.
Water Supply will be provided from the main supply of approved layout/plotted development "Palm Drive", internal/in building provisions of water supply/drinking water has been done.
The sewer system will be connected to the main sewer systems of approved layout/plotted development of "Palm Drive", internal/in building provision of sewer system has been done.
Open saucer drain is provided in set back area and connected to the drainage system of approved layout/plotted development "Palm Drive"
Provisions of the required park as per norms has been already done in approved layout/plotted development "Palm Drive"
3 nos. of trees as per approved map of GDA.
Provisions of electric supply and street lighting have been done as per norms and main electricity will be distributed from ESS of approved layout/plotted development "Palm Drive".
Provision of required community building as per norms has been already done in approved layout/plotted development "Palm Drive"
Provisions of required STP as per norms have been already done in approved layout/plotted development "Palm Drive", the disposal of sewerage will be done in sewer line of layout.
Provisions of required solid waste management as per norms has been already done in the approved layout/plotted development "Palm Drive", the solid waste generated from this building will be collected/treated as the solid system of the layout.
Provisions of water harvesting as per norms have been already done in the approved layout/plotted development "Palm Drive". The terrace water of the building will be connected to the water harvesting line of the layout.
Provisions of energy management system as per norms has been done in approved layout/plotted development "Palm Drive"
Provisions of the Fire Fighting System will be done as per NOC from Fire Department.
Provisions of Social Infrstrauture and other public amenities have been incorporated in the approved layout/plotted development "Palm Drive". Provision of public toilet has been done.
As the height of the building is below 15 mt. and the covered area of 1 floor is less than 500 sq. mt., there is no requirement for an emergency evacuation system. Moreover provision of 1.5 mt. and a wide ventilated staircase and 1 side open corridor are provided.
No other misc. work is pending and if GDA/other competent department asks for some other works as per the amended govt. norms (before completion), it will be incorporated in development work
Showing 1 blocks with 15 units
Total Carpet Area
218.00 m²
2346.53 ft²
Total Units
15
1 different types
Blocks & Floors
1
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
242.03 m²
2605.19 ft²