Launch Date
Completion Date
RERA ID
28°35'19.23''N077°26'30.56''E
28°35'20.66''N 077°26'35.04''E
east side - Plot of other, North side - Plot of other, South - Road, West - Road
Boundary wall – combination of RCC and Brick Work
All internal roads in concrete paver blocks
Footpath in stone, stamp concrete and grass
Water supply from Authority
Sewer line with required slope and adequate manholes
Adequate catch basin and manholes are provided for surface drain
Green area is provided
Variety of trees and shrubs are to be planted
Sufficient lighting as per service and landscape consultant
Community buildings with various amenities will be provided
stp is proposed
as per authority
Rain water harvesting
na
As per fire fighting Norms
club, community center, Gym,etc
fire staircase in each tower/blocks
na
Showing 3 blocks with 99 units
Total Carpet Area
19166.84 m²
206309.95 ft²
Total Units
292
3 different types
Blocks & Floors
3
25 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
95970.00 m²
1033011.48 ft²