Launch Date
Completion Date
RERA ID
25.182928
82.58302
The project consists of phases in which this phase 2 B is of 1276 sq mtrs having Lat-25_18_30.05"N & Lang-82_57_57.69_E, Lat-25_18_32.49_N & Lang-82_57_57.80_E, Lat-25_18_32.33_N & Lang-82_57_99.09_E, Lat-25_18_29.92_N & Lang-82_57_58.67_E
The Promoter has provided 9" Brickwork with an RCC frame Boundary Wall. The project is situated in an already registered GH project wherein a boundary exists.
The promoter has provided Road work 60mm thick paver block laid over sand bed over rammed earth. The project is in an already registered GH project with road work already done.
Not Applicable on this project phase.
The Promoter has provided 2 nos. borewells with Overhead Tanks in the project for water supply to its allottees.
The promoter has provided an underground system using UPVC(SN-4) sewer pipes in the project for allottees.
The promoter has provided an underground system using RCC for drain work.
The promoter has provided green open areas for Parks wherein many type of trees will be planted for the allottees of the project.
The promoter has provided Trees & flowers planted in front of every row house for the beautification of the project.
The promoter has provided 400 KVA Transformer , Metal polls using LED lights for street lighting. The same has already been developed in the project for ease of living for allottees.
The promoter has provided Community Hall, fully equipped gymnasium, swimming pool, synthetic badminton court in the earlier phase of the project, the customers of this project will have access to it.
In the entire project, sewage drains are connected to the new main sewage line of the city.
The Solid Waste Management And Disposal System has been developed and the same are collected by Society and disposed by Municipality.
Rainwater Harvesting system has been provided with dedicated borewell for water conservation in the Project.
The Solar panels has been provided on terrace for energy management. It is attached to grid through common society meter.
Fire Fighting facility provided in common areas while Individual owner can install their own system as per their and local authorities requirement.
Not Applicable for this project phase.
Balcony will also be used for evacuation. Assembly points areas will be demarcated for earthquake and other possible disasters.
Not Applicable for this project phase.
Total Area
24440.00 m²
263069.72 ft²