The plot in question has been allotted after demarcation by UP Awas Vikas Parishad. Hense, the demarcation is complete
Excavation work has almost been completed
Drawings / layout of the roads have been finalised, the work of Roads is yet to start
The work of footpaths is yet to start
Drawings containing scheme of water supply including drinking water has been prepared. The work will be undertaken at the appropriate stage of construction.
The drawings containing the scheme of sewage system has been prepared and necessary work will be done at appropriate stage of construction.
The drawings for drainage system have been prepared.
Green area /small park have been earmarked in the layout of the complex and will be developed at appropriate stage
Tree plantation will be done at the appropriate stage
Design/Drawings for electric supply including street lighting has been prepared
As per sanction
As per sanction
As per norms
As per sanction
As per sanction
As per sanction
NA
As per norms
-
Showing 1 blocks with 26 units
Total Carpet Area
8509.92 m²
91599.93 ft²
Total Units
96
2 different types
Blocks & Floors
1
26 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
6960.28 m²
74919.76 ft²