NewActive

lok sabha employees cooperative housing society

Ghaziabad, Uttar Pradesh
01-12-2020
Launch Date
New
Type
30-11-2023
Completion Date

Overview

Launch Date

01-12-2020

Completion Date

30-11-2023

RERA ID

UPRERAPRJ527907

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)3480
Project Namelok sabha employees cooperative housing society
Registration Fee (in Rs.)22500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)36
DistrictGhaziabad
Original Start Date-
TehsilGhaziabad
Proposed Start Date01-12-2020
Sanctioning Competent AuthorityU.P. Awas Evam Vikas Parishad
Project Cost (in Lacs)2157
Proposed Completion Date30-11-2023

Location

Latitude

28.646613

Longitude

77.399441

Bank Details

Account no.002300340000273
Name Of Account HolderLok Sabha Employees Coop Housing Society
Bank NameUTTAR PRADESH CO-OPERATIVE BAK LTD
Branch AddressGHAZIABAD
Branch NameGHAZIABAD BRANCH
IFSC CodeICICI00UPSCB

Development Works

Demarcation of Plots

The plot in question has been allotted after demarcation by UP Awas Vikas Parishad. Hense, the demarcation is complete

Boundary Wall

Excavation work has almost been completed

Road Work

Drawings / layout of the roads have been finalised, the work of Roads is yet to start

Footpaths

The work of footpaths is yet to start

Water Supply Including Drinking Water Facilities

Drawings containing scheme of water supply including drinking water has been prepared. The work will be undertaken at the appropriate stage of construction.

Sewer System

The drawings containing the scheme of sewage system has been prepared and necessary work will be done at appropriate stage of construction.

Drain

The drawings for drainage system have been prepared.

Parks

Green area /small park have been earmarked in the layout of the complex and will be developed at appropriate stage

Tree Planting

Tree plantation will be done at the appropriate stage

Design For Electric Supply Including Street Lighting

Design/Drawings for electric supply including street lighting has been prepared

Community Buildings

As per sanction

Treatment and Disposal System of Sewage and Sullage water

As per sanction

Solid Waste Management And Disposal System

As per norms

Water Conservation System

As per sanction

Energy Management System Including Use of Renewable Energy

As per sanction

Fire Protection And Fire Safety System

As per sanction

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

As per norms

Other Miscellaneous Work

-

Documents

Allotment Letter issued by Competent Authority

No: LA-01A/09 | Date: 22-08-2019

Details of Encumbrances

Commencement Certificate

Commencement Certificate

Commencement Certificate

Other Plan(If Any)

Proforma of Allotment Letter

Proforma of Completion Certificate(Occupancy)

Affidavit

ARCHITECT CERTIFICATE

Commencement Certificate

Uploaded: 20-03-2021

Proforma of Application Form

Uploaded: 04-01-2021

Proforma of Allotment Letter

Uploaded: 19-03-2021

Proforma of Conveyance Deed

Uploaded: 20-03-2021

Waste Disposal Plan

Uploaded: 04-01-2021

Water Supply Plan

Uploaded: 04-01-2021

Electricity Supply Plan

Uploaded: 04-01-2021

Development Work Plan

Uploaded: 04-01-2021

Affidavit

Uploaded: 15-02-2021

CA CERTIFICATE

Uploaded: 20-03-2021

ARCHITECT CERTIFICATE

Uploaded: 19-03-2021

ENGINEERS CERTIFICATE

Uploaded: 20-03-2021

Permits

Orignal Permit No874/VA NI-5/online/2020
Orignal Permit Date18-03-2020
Valid Upto17-03-2025
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto17-03-2025
End Date30-11-2023
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Shri Gaurav Kumar Gupta
Contractor AddressUnity Aurum construction Pvt.,Ltd, D-113, LGF,Sector-63, Noida, Gautam budh Nagar, UP-201301
Architect NameShri Deepak Mehta
Architect AddressM/s Deepak Mehta and Associates, First and Second Floor, Plot no 16, abhishek Plaza, LSC, Mayur Vihar, Phase-II, Delhi-110091
Architect Licence NumberCOA/87/10840
Structural Engineer NameMs Revati Raman Singh
Structural Engineer AddressM/s Keen Associates Pvt Ltd, H-53, 1st Floor, Opp Vijaya bank, Commercial area-201301, UP
Mobile number(Project Co-ordinator)9868109777

Land Details

AFS

Showing 1 blocks with 26 units

Property Summary

Total Carpet Area

8509.92

91599.93 ft²

Total Units

96

2 different types

Blocks & Floors

1

26 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:88.64
Balconies:72
Parking ratio:0.00 per unit

Block A

26 units

Khasra Details

Total Area

6960.28

74919.76 ft²

2 plots
Plot
TypePlot
Khasra/Plot NoGroup Housing plot no 3/SP9, Sidharth Vihar Yojna,Gaziabad
Area(In Sq. Mt.)3480.28
Plot
TypePlot
Khasra/Plot No3/SP9
Area(In Sq. Mt.)3480

Other Details

Contractor Name (if any)Shri Gaurav Kumar Gupta
Contractor AddressUnity Aurum construction Pvt.,Ltd, D-113, LGF,Sector-63, Noida, Gautam budh Nagar, UP-201301
Architect NameShri Deepak Mehta
Architect AddressM/s Deepak Mehta and Associates, First and Second Floor, Plot no 16, abhishek Plaza, LSC, Mayur Vihar, Phase-II, Delhi-110091
Architect Licence NumberCOA/87/10840
Structural Engineer NameMs Revati Raman Singh
Structural Engineer AddressM/s Keen Associates Pvt Ltd, H-53, 1st Floor, Opp Vijaya bank, Commercial area-201301, UP
Mobile number(Project Co-ordinator)9868109777