NewActive

KRISHNA VILLAS

Agra, Uttar Pradesh
01-04-2021
Launch Date
New
Type
30-07-2025
Completion Date

Overview

Launch Date

01-04-2021

Completion Date

30-07-2025

RERA ID

UPRERAPRJ176038

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)19339
Project NameKRISHNA VILLAS
Registration Fee (in Rs.)102000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)52
DistrictAgra
Original Start Date-
TehsilAgra
Proposed Start Date01-04-2021
Sanctioning Competent AuthorityAgra Development Authority
Project Cost (in Lacs)3416
Proposed Completion Date30-07-2025

Location

Latitude

27.198088

Longitude

77.930131

Bank Details

Account no.0080102000050926
Name Of Account HolderAgra Infra Planners Private imited
Bank NameIDBI
Branch AddressG 10/8 Padamdeep Tower Ground Floor Sanjay Place Agra 282002
Branch NameSanjay Place Agra
IFSC CodeIBKL0000080

Development Works

Demarcation of Plots

Each plot will be demarcated as per the layout plan approved by Agra Development Authority. The state -of-Art Equipment will be put to use to keep the measurements and alignments as is.

Boundary Wall

This is a Access controlled residential project with single gate entry. Keeping the safety of residents on priority an 8 feet high boundary wall will be constructed. The brick wall will be plastered and painted. The foundation of the wall will stand against atmospheric pressures and Earthquakes.

Road Work

A flexible pavement will be constructed as the project roads. The pavement layers will be compacted to the desired density with suitable compaction keeping the desired/required longitudinal and transverse gradient. The Pavement layers over subgrade are Granular Sub-base, Granular base in two layers and premix carpet as wearing course.

Footpaths

A paver block multicolored foot paths will be laid in the project at the identified locations. An M-30 Grade block 4 to 6 inch deep will be laid on a sand bed to assist safe and smooth walking surface along park periphery.

Water Supply Including Drinking Water Facilities

A potable Ground water Supply will be installed to provide water to all the units of the project . A water Pipe line will be laid at the desired gradient to maintain the flow to all the units. The water connection will also be placed at parks and suitable common areas.

Sewer System

The hume pipes of designed diameters and length will be installed through out the project. Inlets from each unit will lead in to the common sewerage pipes. The waste will then the lead to the Municipal sewer line. Inspection chambers will be installed to cater for any blockage.

Drain

Lined open/under ground drain will be laid across the project maintaining the longitudinal and transverse gradient . The size of drains will be so designed to provide easy disposal . Inspection chambers to assist smooth flow will be installed .

Parks

Two Parks of 1450 Sq.m each will be developed. The parks will be provided with benches, Play area for kids and walking areas as well. The lush green grass bed will be laid in the parks and the trees will be planted along the hedge.

Tree Planting

The maximum possible trees of different type will be planted in the project land as per the landscape plan. The trees selected will be all weather trees providing the shade and natural beauty to the project.

Design For Electric Supply Including Street Lighting

A separate transformer bearing the capacity to cater for projects common area needs and all domestic use will be installed as per Torrent powers design. Electrical connections will lead to each individual unit and common areas. The sufficiently high street lights will be installed for clear vision at night hours.

Community Buildings

Not Applicable

Treatment and Disposal System of Sewage and Sullage water

Not Applicable

Solid Waste Management And Disposal System

A dalab Ghar will be constructed as per the approved layout to cater for the solid waste generated . In addition a detachable dust bin will be installed at all suitable location to collect the waste.

Water Conservation System

4 Numbers of Rain water harvesting system pits will be installed . 2 in each park. The roof/storm water will be collected in the pits tat in turn will help recharge the ground water table.

Energy Management System Including Use of Renewable Energy

Not Applicable

Fire Protection And Fire Safety System

Not Applicable

Social Infrastructure And Other Public Amenities Including Public Health Services

Not Applicable

Emergency Evacuation Services

Not Applicable

Other Miscellaneous Work

As per Project Needs.

Documents

Allotment Letter issued by Competent Authority

No: Allahabad High Court Order for Folio No 44252 of 2016 | Date: 10-02-2016

Registry Document

No: 1090/1/811/395-970 part 1 | Date: 30-09-2011

Registry Document

No: 1090/1/811/395-970 Part 2 | Date: 30-09-2011

Registry Document

No: 1090/1/811/395-870 Part 3 | Date: 30-09-2011

Registry Document

No: 1090/1/811/395-870 Part 4 | Date: 30-09-2011

Registry Document

No: 1090/1/811/395-870 Part 5 | Date: 30-09-2011

Registry Document

No: 1090/1/811/395-870 Part 6 | Date: 30-09-2011

Extract of Khatauni

No: 1425-1430 | Date: -

Extract of Khatauni

No: 1425-1430 | Date: -

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 20-02-2021

Commencement Certificate

Uploaded: 19-02-2021

Other Plan(If Any)

Uploaded: 19-02-2021

Proforma of Application Form

Uploaded: 20-02-2021

Proforma of Allotment Letter

Uploaded: 20-02-2021

Proforma of Conveyance Deed

Uploaded: 19-02-2021

Waste Disposal Plan

Uploaded: 16-03-2021

Water Supply Plan

Uploaded: 16-03-2021

Electricity Supply Plan

Uploaded: 16-03-2021

Development Work Plan

Uploaded: 16-03-2021

Affidavit

Uploaded: 19-02-2021

CA CERTIFICATE

Uploaded: 20-02-2021

ARCHITECT CERTIFICATE

Uploaded: 20-02-2021

ENGINEERS CERTIFICATE

Uploaded: 20-02-2021

Permits

Orignal Permit No20200102153831310
Orignal Permit Date31-07-2020
Valid Upto30-07-2025
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto30-07-2028
End Date30-07-2025
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Self
Contractor AddressB2/8 Kamla Nagar, Agra 282005
Architect NameVinod Kumar Sharma
Architect Address17/430, Arya Nagar Firozabad
Architect Licence NumberCA/95/18554
Structural Engineer NameA.K Upadhyay
Structural Engineer Address56, Jaipur House Market Agra 282002
Mobile number(Project Co-ordinator)9319105376

Khasra Details

Total Area

19405.00

208873.48 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No158 A and 158B and Plot No. C-2
Area(In Sq. Mt.)19405

Other Details

Contractor Name (if any)Self
Contractor AddressB2/8 Kamla Nagar, Agra 282005
Architect NameVinod Kumar Sharma
Architect Address17/430, Arya Nagar Firozabad
Architect Licence NumberCA/95/18554
Structural Engineer NameA.K Upadhyay
Structural Engineer Address56, Jaipur House Market Agra 282002
Mobile number(Project Co-ordinator)9319105376