OngoingActive

_Iris Tower_ of project Cloud 9 Towers

Ghaziabad, Uttar Pradesh
23-07-2015
Launch Date
Ongoing
Type
30-06-2019
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

30-06-2019

RERA ID

UPRERAPRJ2956

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)2970
Project Name_Iris Tower_ of project Cloud 9 Towers
Registration Fee (in Rs.)20000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)48
DistrictGhaziabad
Original Start Date23-07-2015
TehsilGhaziabad
Proposed Start Date23-07-2015
Sanctioning Competent AuthorityGhaziabad Development Authority
Project Cost (in Lacs)6000
Proposed Completion Date30-06-2019

Location

Latitude

28 38' 51' N

Longitude

077 23' 01'' E

Bank Details

Account no.000405110335
Name Of Account HolderRISHABH BUILDWELL PVT. LTD
Bank NameICICI
Branch AddressNariman Point, Mumbai
Branch NameNariman Point Branch
IFSC CodeICIC0000004

Development Works

Demarcation of Plots

100% completed

Boundary Wall

100% completed

Road Work

Water proofing completed, Earth filling partly completed completed. Drive way execution yet to start.

Footpaths

Work started

Water Supply Including Drinking Water Facilities

Material procurement completed, yet to start

Sewer System

100% completed

Drain

Drain ready but yet to cover

Parks

Execution yet to start

Tree Planting

Execution yet to start

Design For Electric Supply Including Street Lighting

Electrical meter room, sub station, receiving station 100% completed. Street lighting work yet to commence

Community Buildings

Structure ready, Execution of finished yet to start.

Treatment and Disposal System of Sewage and Sullage water

Completed

Solid Waste Management And Disposal System

40% work completed

Water Conservation System

Rain water harvesting yet to develop

Energy Management System Including Use of Renewable Energy

Dual energy meter yet to arrange and fix

Fire Protection And Fire Safety System

Under progress

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

Work under progress

Other Miscellaneous Work

NA

Documents

Registry Document

No: 366 | Date: 18-01-2011

Other Plan(If Any)

Other Plan(If Any)

Other Plan(If Any)

Details of Encumbrances

Uploaded: 09-08-2019

Commencement Certificate

Uploaded: 09-08-2019

Proforma of Application Form

Uploaded: 09-08-2019

Proforma of Allotment Letter

Uploaded: 09-08-2019

Development Work Plan

Uploaded: 09-08-2019

Affidavit

Uploaded: 09-08-2019

CA CERTIFICATE

Uploaded: 05-07-2018

Registry Document In Case of Own Land

Uploaded: 28-07-2017

Authentic copy of Approval of Project

Uploaded: 28-07-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 28-07-2017

Other Plan(If Any)

Uploaded: 28-07-2017

Floor plans of all types

Uploaded: 29-01-2018

Floor plans of all types

Uploaded: 29-01-2018

Floor plans of all types

Uploaded: 29-01-2018

Floor plans of all types

Uploaded: 30-01-2018

Permits

Orignal Permit No156/GH/Zone-6
Orignal Permit Date06-06-2015
Valid Upto05-06-2020
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto-
End Date30-06-2019
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No156/GH/Zone-6
Orignal Permit Date06-06-2015
Valid Upto05-06-2020
Revalidated Permit No156/GH/Zone-6
Revalidated Permit Date06-06-2015
Revalidated Permit Valid Upto01-01-1900
Permit Extendable Upto05-06-2020
End Date30-06-2019
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No156/GH/Zone-6
Orignal Permit Date06-06-2015
Valid Upto05-06-2020
Revalidated Permit No156/GH/Zone-6
Revalidated Permit Date06-06-2015
Revalidated Permit Valid Upto01-01-1900
Permit Extendable Upto05-06-2023
End Date30-06-2019
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No156/GH/Zone-6
Orignal Permit Date06-06-2015
Valid Upto05-06-2020
Revalidated Permit No156/GH/Zone-6
Revalidated Permit Date06-06-2015
Revalidated Permit Valid Upto05-06-2020
Permit Extendable Upto05-06-2023
End Date30-06-2019
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Mr. F.K. Budhouliya
Contractor AddressM/s Techno FAC Contracts Pvt. Ltd., Flat No. - A-1006, 10th Floor, Rishabh Paradise, Ahinsa Khand – II, Indirapuram, Ghaziabad, Ph.: 8377002834
Architect NameMr. Gyan Prakash Mathur
Architect AddressM/s Gian P. Mathur & Associates Pvt. Ltd., C-55, East of Kailash, New Delhi, Ph.: 011-46599599
Architect Licence NumberCA - 80/5769
Structural Engineer NameMr. Manish Gupta
Structural Engineer AddressM/s Manish consultants, C-8/01, Ardee City, Gurgaon, Ph.: 0124-4295189/4144714
Mobile number(Project Co-ordinator)9582229614

Land Details

AFS

Showing 1 blocks with 108 units

Property Summary

Total Carpet Area

10896.39

117287.65 ft²

Total Units

162

2 different types

Blocks & Floors

1

27 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:67.26
Balconies:304
Parking ratio:0.00 per unit

Block Iris Tower

108 units

Khasra Details

Total Area

2970.00

31968.78 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No602, 603/2, 603/3
Area(In Sq. Mt.)2970

Other Details

Contractor Name (if any)Mr. F.K. Budhouliya
Contractor AddressM/s Techno FAC Contracts Pvt. Ltd., Flat No. - A-1006, 10th Floor, Rishabh Paradise, Ahinsa Khand – II, Indirapuram, Ghaziabad, Ph.: 8377002834
Architect NameMr. Gyan Prakash Mathur
Architect AddressM/s Gian P. Mathur & Associates Pvt. Ltd., C-55, East of Kailash, New Delhi, Ph.: 011-46599599
Architect Licence NumberCA - 80/5769
Structural Engineer NameMr. Manish Gupta
Structural Engineer AddressM/s Manish consultants, C-8/01, Ardee City, Gurgaon, Ph.: 0124-4295189/4144714
Mobile number(Project Co-ordinator)9582229614
_Iris Tower_ of project Cloud 9 Towers by RISHABH BUILDWELL PVT. LTD. | ReraTracker