Launch Date
Completion Date
RERA ID
77.413877
28.703811
NA
1800 mm high, along entire periphery in brick massonary with FPS bricks of class designation in 75 in ratio of 16 cement mortar on RCC footing and column structure
Interlocking Pavers/Trimix with proper longitudinal and cross sectional road slopes in well compacted subgrade of adequate layers of sand
Interlocking Pavers/Chequered Tiles over well compacted subgrade of adequate layers of sand
One Under Ground Tank of 180 KLD with water supply lines from underground tank to individual units as per MEP drawings
Underground system using uPVC (SN-4) pipes and making of circular manholes or rectangular manhole with proper finished formation level as per MEP drawings
Underground system using uPVC (SN-4) sewer pipes for storm water drainage with circular or rectangular manholes with finished formation as per MEP drawings
Parks having total area of 1105 sq. m. shall be provided with requisite landscaping as per landscaping drawings
110 nos. of trees are to be planted out of that 50 per cent will be evergreen tree to be planted at places as per landscaping drawings
Three Electricity Transformers of 1500 KVA capacity each shall be used along with necessary stitch gear for distributing electricity at LT voltage/ as per requirement and with the provisions of required capacity of transformers as per UPPCL guidelines
NA
STP of capacity 150 KLD shall be provided. Treated water shall be used for flushing, irrigation, carwash, pathways cleaning and excess sewage shall be discharged in the municipal sewer as per MEP drawings
Treated water shall be used for Manual collection and organic waste convertor shall be provided in the project
Rain water harvesting facilities shall be provided and treated sewage water shall be recycled to the extent feasible as per MEP drawings
Solar panels shall be provided on terrace for renewable energy. Single point metering will be there for energy purchase from the grid/ power supply company
Fire tender path shall be provided as per NBC. Fire fighting systems along with pumps and water storage tanks shall be provided as per NBC and NOC from the department
NA
Staircases shall be provided in Basement and all the Towers for fire/emergency exit as per norms
NA
Showing 1 blocks with 137 units
Total Carpet Area
7629.80 m²
82126.40 ft²
Total Units
166
2 different types
Blocks & Floors
1
5 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
9428.27 m²
101484.96 ft²