NewActive

Himalaya City Center Phase-1

Ghaziabad, Uttar Pradesh
01-01-2021
Launch Date
New
Type
31-12-2024
Completion Date

Overview

Launch Date

01-01-2021

Completion Date

31-12-2024

RERA ID

UPRERAPRJ728824

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)12730
Project NameHimalaya City Center Phase-1
Registration Fee (in Rs.)138000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)48
DistrictGhaziabad
Original Start Date-
TehsilGhaziabad
Proposed Start Date01-01-2021
Sanctioning Competent AuthorityGhaziabad Development Authority
Project Cost (in Lacs)11542
Proposed Completion Date31-12-2024

Location

Latitude

77.410909

Longitude

28.705400

Bank Details

Account no.920020066550058
Name Of Account HolderRB Infrastate Pvt. Ltd. Himalaya CT CTR PH-One RERA Ac
Bank NameAxis Bank
Branch AddressFirst Floor, unit No. F-120,121,122,123 Khasra No. 1108, VVIP Style, Raj Nagar Extension, Ghaziabad-201017
Branch NameRaj Nagar Extension Branch
IFSC CodeUTIB0004428

Development Works

Demarcation of Plots

Not Applicable

Boundary Wall

1800 mm wall in brick massonery along with the entire periphery on RCC footing and column structure

Road Work

Providing and laying of Interlocking Pavers/ Trimix over well compacted subgrade layers

Footpaths

Providing and laying of Interlocking Pavers/ Chequered Tiles over well compacted subgrade layers

Water Supply Including Drinking Water Facilities

One Underground Tank of 180 KLD and laying of pipes as per MEP designs with manholes of required size

Sewer System

Underground System using uPVC (SN-4) Sewer pipes and making of manholes of required brick massonery with manhole covers

Drain

Underground System using uPVC(SN-4) pipes and making of manholes of required civl massonery work

Parks

Parks having total area of 1105 sq. meters shall be provided

Tree Planting

110 nos. trees are to be planted out of that 55 will be evergreen tree

Design For Electric Supply Including Street Lighting

Three Electricity Transformers of 1500 KVA capacity each shall be used along with necessary stich gear for distributing electricity at LT voltage/ as per requirement

Community Buildings

Not Applicable

Treatment and Disposal System of Sewage and Sullage water

STP of capacity 150 KLD shall be provided. Treated water shall be used for flushing, irrigation, carwash, pathways cleaning and excess sewage shall be discharged in municipal sewer

Solid Waste Management And Disposal System

treated water shall be used for manual collection and organic waste converter shall be provided in the project

Water Conservation System

Rain water harvesting facilities shall be provided and treated sewage water shall be recycled to the extent feasible

Energy Management System Including Use of Renewable Energy

Solar panels shall be provided on terrace for renewable energy. Single point metering will be there for energy purchased from the grid/ power supply company

Fire Protection And Fire Safety System

Fire tender path shall be provided as per NBC fire fighting systems along with pumps and water storage tanks shall be provided as per NBC and NOC from fire department

Social Infrastructure And Other Public Amenities Including Public Health Services

Not Applicable

Emergency Evacuation Services

Staircase shall be provided in basement and all the towers for fire/ emergency exit as per norms

Other Miscellaneous Work

Not Applicable

Documents

Registry Document

No: 6458 | Date: 10-05-2019

Registry Document

No: 6455 | Date: 10-05-2019

Registry Document

No: 6456 | Date: 10-05-2019

Registry Document

No: 6460 | Date: 10-05-2019

Extract of Khatauni

No: 1427-1432 | Date: -

Extract of Khatauni

No: 1427-1432 | Date: -

Details of Encumbrances

Uploaded: 22-12-2020

Commencement Certificate

Uploaded: 22-12-2020

Other Plan(If Any)

Uploaded: 22-12-2020

Proforma of Application Form

Uploaded: 22-12-2020

Proforma of Allotment Letter

Uploaded: 22-12-2020

Proforma of Conveyance Deed

Uploaded: 22-12-2020

Proforma of Completion Certificate(Occupancy)

Uploaded: 22-12-2020

Waste Disposal Plan

Uploaded: 22-12-2020

Water Supply Plan

Uploaded: 22-12-2020

Electricity Supply Plan

Uploaded: 22-12-2020

Development Work Plan

Uploaded: 22-12-2020

Affidavit

Uploaded: 22-12-2020

CA CERTIFICATE

Uploaded: 15-01-2021

ARCHITECT CERTIFICATE

Uploaded: 22-12-2020

ENGINEERS CERTIFICATE

Uploaded: 22-12-2020

Permits

Orignal Permit No2614/MasterPlan/Zone-1/2020
Orignal Permit Date07-10-2020
Valid Upto17-08-2025
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto17-08-2028
End Date31-12-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Virendera Kumar Gupta
Contractor AddressVaishnavi Construction, 231, UGF-1, RHS Niti Khand, Indirapuram, Ghaziabad-201014
Architect NameVishal Mittal
Architect AddressSpace Design International B-34, Sector-67, Noida-201301
Architect Licence NumberCA/98/23185
Structural Engineer NameVD Sharma
Structural Engineer AddressOptimum Designs Pvt. Ltd., B-24, Sector 67, Noida-201301
Mobile number(Project Co-ordinator)7982476398

Land Details

AFS

Showing 1 blocks with 197 units

Property Summary

Total Carpet Area

10652.25 m²

114659.75 ft²

Total Units

554

2 different types

Blocks & Floors

1

4 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:19.23 m²
Balconies:0
Parking ratio:0.00 per unit

Block Block B

197 units

Khasra Details

Total Area

12730.00 m²

137024.45 ft²

4 plots
Khasra
TypeKhasra
Khasra/Plot No537
Area(In Sq. Mt.)6240
Khasra
TypeKhasra
Khasra/Plot No538
Area(In Sq. Mt.)843
Khasra
TypeKhasra
Khasra/Plot No538
Area(In Sq. Mt.)4804
Khasra
TypeKhasra
Khasra/Plot No538
Area(In Sq. Mt.)843

Other Details

Contractor Name (if any)Virendera Kumar Gupta
Contractor AddressVaishnavi Construction, 231, UGF-1, RHS Niti Khand, Indirapuram, Ghaziabad-201014
Architect NameVishal Mittal
Architect AddressSpace Design International B-34, Sector-67, Noida-201301
Architect Licence NumberCA/98/23185
Structural Engineer NameVD Sharma
Structural Engineer AddressOptimum Designs Pvt. Ltd., B-24, Sector 67, Noida-201301
Mobile number(Project Co-ordinator)7982476398
Himalaya City Center Phase-1 by R B INFRAESTATE PVT. LTD. | ReraTracker