Demarcation of Plots is done by 4 inch bricks work
This Phase is surrounded by other land to come under other phase in same project
8780 Running Square meter bitumin roads are under construction on site
17560 Running square meter of footpath is provisioned to be made on site
Drinking water supply line of 2408 RMT is under construction
1486 RMT under ground sewerage line is laid in this Phase and which is connected main sewer line which is further connected with common Sewerage treatment plant situated under other phase in same project
2328 RMT open storm water drain are provisioned to be made on site.
2 Nos. Park are provisioned to be made on site which is under construction
green area and tree plantation is provisioned in the Integrated township as a whole of which this project is a part.
Electricity poles with the street lights are provisioned under this phase the pole are already installed and lights will be installed shortly. Electricity supply is provisioned from the Power house installed in other phase of the same project.
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
Other miscellaneous works as per requirement to complete this phase are under construction.
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
52088.75 m²
560678.10 ft²