DWARIKA BALAJI LIG/EWS

Muzaffarnagar, Uttar Pradesh
01-07-2023
Launch Date
New
Type
03-06-2027
Completion Date

Overview

Launch Date

01-07-2023

Completion Date

03-06-2027

RERA ID

UPRERAPRJ170765/03/2025

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)10475
Project NameDWARIKA BALAJI LIG/EWS
Registration Fee (in Rs.)57500
AddressDwarika City, 4th Miles Stone, Jansath Road
Village/Locality/Sector etc.Muzaffarnagar
StateUttar Pradesh
Project Duration (In month)48
DistrictMuzaffarnagar
Original Start Date-
TehsilMuzaffarnagar
Proposed Start Date01-07-2023
Sanctioning Competent AuthorityMuzaffarnagar Development Authority
Project Cost (in Lacs)2538
Proposed Completion Date03-06-2027

Location

Latitude

29.44947

Longitude

77.72846

Bank Details

Account Details
Name of the AccountDB_COLL A/C_DWARIKA BALAJI_LIG/EWS
Account Number42903984939
Bank NameSTATE BANK OF INDIA
Branch NameSTATE BANK OF INDIA
Branch AddressRAILWAY ROAD, MUZAFFARNAGAR
Branch StateUttar Pradesh
Branch DistrictMuzaffarnagar
IFSC CodeSBIN0000685
Branch Email AddressSBI.00685@SBI.CO.IN
Separate Account Details
Name of the AccountDB_SEP A/C_DWARIKA BALAJI LIG/EWS
Account Number42903986039
Bank NameSTATE BANK OF INDIA
Branch NameSTATE BANK OF INDIA
Branch AddressRAILWAY ROAD, MUZAFFARNAGAR, UTTARPRADESH
Branch StateUttar Pradesh
Branch DistrictMuzaffarnagar
IFSC CodeSBIN0000685
Transaction Account Details
Name of the AccountDB_TRAN A/C_DWARIKA BALAJI LIG/EWS
Account Number42903986562
Bank NameSTATE BANK OF INDIA
Branch NameSTATE BANK OF INDIA
Branch AddressRailway Road, Muzaffarnagar, Uttar Pradesh
Branch StateUttar Pradesh
Branch DistrictMuzaffarnagar
IFSC CodeSBIN0000685

Development Works

Demarcation of Plots

Out of total township, 10475.33 square meter plot having 1 main gate from road which has been has been completed.

Boundary Wall

2 meter hight and 230 mm thick brick work and rcc work in column and beam. Boundary wall preparation work is under progress and will be completed after completion of construction work.

Road Work

from the main entrance gate we have 80 mm thick interlocking brick/rcc road, Road work is completed approx 85 percent and will be completed after completion of building construction work.

Footpaths

Approx 85 percent work of Footpaths work is completed

Water Supply Including Drinking Water Facilities

We have constructed 2 water tank in the township to supply water which will supply water .

Sewer System

All sewerage water shall be go to the STP which has been constructed in the township .

Drain

Strom water shall be provided. Strom water from roads and other landscape area shall be connected to the storm water drain channel and to to the rain water. Drain work is also under progress and about 85 percent work get completed.

Parks

We have provided green area with different activities which has already been completed in the township.

Tree Planting

Tree Plantation area is under this phases, It is part of overall township and have been completed under other phases.

Design For Electric Supply Including Street Lighting

we have designed and implemented the system as per electricity board and have considered centralized transformer, HT panel, LT panel, Feeder pillar for common services like external lighting, STP, pump room etc.

Community Buildings

This area is part of other phases under the township and not situated under this phase.

Treatment and Disposal System of Sewage and Sullage water

All sewerage water shall go to the STP and overflow from the STP shall be connected with municipal sewerage. STP has been constructed in the township.

Solid Waste Management And Disposal System

There is a proper garbage collection area provided for solid waste management which is situated in the township.

Water Conservation System

Flushing water demand shall be fulfill by STP treated water which is situated in the township.

Energy Management System Including Use of Renewable Energy

We will use LED light fitting in all areas which will help to reduce electricity consumption. In pump room also all the equipment shall have energy efficient motor. And we will suggest to residents also to use energy saving equipment.

Fire Protection And Fire Safety System

This is not part of this phases as it is part of other phases which is under progress.

Social Infrastructure And Other Public Amenities Including Public Health Services

This is not part of this phases

Emergency Evacuation Services

This is not part of this phases

Other Miscellaneous Work

All other miscellaneous work is under progress and will be completed once the construction work is completed.

Documents

Registry Document

No: 6979 | Date: 10-07-2009

Registry Document

No: 4842 | Date: 08-05-2007

Registry Document

No: 1223 | Date: 06-02-2015

Registry Document

No: 2383 | Date: 19-02-2022

Registry Document

No: 2385 | Date: 19-02-2022

Registry Document

No: 2384 | Date: 19-02-2022

Registry Document

No: 2386 | Date: 19-02-2022

Registry Document

No: 2387 | Date: 19-02-2022

Registry Document

No: 2382 | Date: 19-02-2022

Other Plan(If Any)

Proforma of Conveyance Deed

CA CERTIFICATE

Other

Other

Proforma of Agreement for Sale

Details of Encumbrances

Uploaded: 28-12-2023

Commencement Certificate

Uploaded: 28-12-2023

Other Plan(If Any)

Uploaded: 28-05-2024

Proforma of Application Form

Uploaded: 28-12-2023

Proforma of Allotment Letter

Uploaded: 28-12-2023

Proforma of Conveyance Deed

Uploaded: 28-12-2023

Waste Disposal Plan

Uploaded: 03-06-2024

Water Supply Plan

Uploaded: 03-06-2024

Electricity Supply Plan

Uploaded: 03-06-2024

Development Work Plan

Uploaded: 03-06-2024

Affidavit

Uploaded: 28-12-2023

CA CERTIFICATE

Uploaded: 03-06-2024

ARCHITECT CERTIFICATE

Uploaded: 28-12-2023

ENGINEERS CERTIFICATE

Uploaded: 28-12-2023

Other

Uploaded: 04-06-2024

Permits

Orignal Permit No166/2022
Orignal Permit Date04-06-2022
Valid Upto03-06-2027
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto06-06-2030
End Date03-06-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)Dwarika Balaji- Promoter itself
Contractor Address4th Mile Stone, Jansath Road, Muzaffarnagar, Uttar Pradesh
Architect NameRishi Sahni
Architect AddressTown Hall Road, Aryapuri, Muzaffarnagar-251001, Uttar Pradesh
Architect Licence NumberCA/2014/63741
Structural Engineer NameMayank Gupta
Structural Engineer Address218/1, Patel Nagar, New Mandi, Muzaffarnagar, Uttar Pradesh
Mobile number(Project Co-ordinator)7351448000

Land Details

AFS

Showing 5 blocks with 20 units

Property Summary

Total Carpet Area

11229.68

120875.15 ft²

Total Units

456

2 different types

Blocks & Floors

5

4 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:24.63
Balconies:456
Parking ratio:0.00 per unit

Block BLOCK-01-EWS

4 units

Block BLOCK-02-LIG

4 units

Block BLOCK-03-LIG

4 units

Block BLOCK-04-LIG

4 units

Block BLOCK-05-EWS

4 units

Khasra Details

Total Area

10475.33

112755.40 ft²

3 plots
Khasra
TypeKhasra
Khasra/Plot No8
Area(In Sq. Mt.)954.97
Khasra
TypeKhasra
Khasra/Plot No9
Area(In Sq. Mt.)8297.06
Khasra
TypeKhasra
Khasra/Plot No42
Area(In Sq. Mt.)1223.30

Other Details

Contractor Name (if any)Dwarika Balaji- Promoter itself
Contractor Address4th Mile Stone, Jansath Road, Muzaffarnagar, Uttar Pradesh
Architect NameRishi Sahni
Architect AddressTown Hall Road, Aryapuri, Muzaffarnagar-251001, Uttar Pradesh
Architect Licence NumberCA/2014/63741
Structural Engineer NameMayank Gupta
Structural Engineer Address218/1, Patel Nagar, New Mandi, Muzaffarnagar, Uttar Pradesh
Mobile number(Project Co-ordinator)7351448000