Commercial Complex by KK Projects at Delhi One

Gautam Buddha Nagar, Uttar Pradesh
18-08-2011
Launch Date
Ongoing
Type
30-04-2018
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

30-04-2018

RERA ID

UPRERAPRJ7166

Basic Details

Project TypeOngoing
Project CategoryCommercial
Total area in round figure (Sq.mt.)10000
Project NameCommercial Complex by KK Projects at Delhi One
Registration Fee (in Rs.)110000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)81
DistrictGautam Buddha Nagar
Original Start Date18-08-2011
TehsilGautam Buddha Nagar
Proposed Start Date18-08-2011
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)44500
Proposed Completion Date30-04-2018

Location

Latitude

28 34 27

Longitude

77 18 40

Bank Details

Account no.308001010931544
Name Of Account HolderKK Projects
Bank NameUnion Bank of India
Branch AddressPatel Nagar, New Delhi - 110008
Branch NamePatel Nagar Branch
IFSC CodeUBIN0530808

Development Works

Demarcation of Plots

Completed as per Plan

Boundary Wall

Boundary Wall with dedicated entry / exit points is planned on all sides of the plot

Road Work

Base preparation is under progress.

Footpaths

Dedicated pedestrian walkway has been planned for access into the building

Water Supply Including Drinking Water Facilities

Centralized Water, Storage, Treatment, Pumping and Distribution System has been planned

Sewer System

We have planned Zero Discharge System and 100% reuse of treated water from STP

Drain

Underground drainage system is planned alongside the internal roads

Parks

NA

Tree Planting

Tree plantation is part of lanscaping scheme / plan

Design For Electric Supply Including Street Lighting

33 KV HT sub-stations is planned within the project premises. External Lighting shall be provided as per building norms

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

Seawage treatment system - based on MBR (Membrane Bio-Reactor) technology is being provided. We have designed for Zero Discharge and 100% reuse of treated water.

Solid Waste Management And Disposal System

Dedicated Garbage sorting and disposal area is planned in the building premises

Water Conservation System

Rain Water Harvesting System is being provided.

Energy Management System Including Use of Renewable Energy

Solar PV system will be installed on rooftop.

Social Infrastructure And Other Public Amenities Including Public Health Services

Public sitting, toilets and drinking water facility has been planned and provisioned in common areas.

Emergency Evacuation Services

Addressable emergency evacuation system complying to NFPA norms is being installed in complete premises

Other Miscellaneous Work

NA

Documents

Lease Deed

No: 4092 | Date: 18-10-2010

Legal Document of Agreement in Case of other Land

Uploaded: 31-07-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 31-07-2017

Affidavit

Uploaded: 30-10-2017

Commencement Certificate

Uploaded: 30-10-2017

Other Plan(If Any)

Uploaded: 30-10-2017

Project Team

Contractor Name (if any)Larsen & Toubro Limited
Contractor AddressMount Poonamallee Road, Manapakkam, Chennai - 600089
Architect NameMr. Sanjay Wadhwa, SWBI Architects
Architect AddressA-80, Sushant Lok Phase - I, Gurgaon - 122001
Architect Licence NumberCA/85/9180
Structural Engineer NameDr. Vinod Jain, Vintech Consultants
Structural Engineer AddressC-35, Pamposh Enclave, Greater Kailash - I, New Delhi -110048
Mobile number(Project Co-ordinator)9810192692

Other Details

Contractor Name (if any)Larsen & Toubro Limited
Contractor AddressMount Poonamallee Road, Manapakkam, Chennai - 600089
Architect NameMr. Sanjay Wadhwa, SWBI Architects
Architect AddressA-80, Sushant Lok Phase - I, Gurgaon - 122001
Architect Licence NumberCA/85/9180
Structural Engineer NameDr. Vinod Jain, Vintech Consultants
Structural Engineer AddressC-35, Pamposh Enclave, Greater Kailash - I, New Delhi -110048
Mobile number(Project Co-ordinator)9810192692