Launch Date
Completion Date
RERA ID
28 34 27
77 18 40
Completed as per Plan
Boundary Wall with dedicated entry / exit points is planned on all sides of the plot
Base preparation is under progress.
Dedicated pedestrian walkway has been planned for access into the building
Centralized Water, Storage, Treatment, Pumping and Distribution System has been planned
We have planned Zero Discharge System and 100% reuse of treated water from STP
Underground drainage system is planned alongside the internal roads
NA
Tree plantation is part of lanscaping scheme / plan
33 KV HT sub-stations is planned within the project premises. External Lighting shall be provided as per building norms
NA
Seawage treatment system - based on MBR (Membrane Bio-Reactor) technology is being provided. We have designed for Zero Discharge and 100% reuse of treated water.
Dedicated Garbage sorting and disposal area is planned in the building premises
Rain Water Harvesting System is being provided.
Solar PV system will be installed on rooftop.
Public sitting, toilets and drinking water facility has been planned and provisioned in common areas.
Addressable emergency evacuation system complying to NFPA norms is being installed in complete premises
NA