NewActive

Civitech Strings

Gautam Buddha Nagar, Uttar Pradesh
01-12-2020
Launch Date
New
Type
10-07-2027
Completion Date

Overview

Launch Date

01-12-2020

Completion Date

10-07-2027

RERA ID

UPRERAPRJ646272

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)18000
Project NameCivitech Strings
Registration Fee (in Rs.)95000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)80
DistrictGautam Buddha Nagar
Original Start Date-
TehsilGautam Buddha Nagar
Proposed Start Date01-12-2020
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)23000
Proposed Completion Date10-07-2027

Location

Latitude

28.335517

Longitude

77.285762

Bank Details

Account no.6717002900000075
Name Of Account HolderSAG Realtech Private Limited
Bank NamePunjab National Bank
Branch AddressPNB, Sector-63, NOIDA-201301
Branch NamePNB sector- Sixty three
IFSC CodePUNB0671700

Development Works

Demarcation of Plots

Project plot area is 18000 SQ.M. Plot will be demarcated by boundary walls made of RCC frameworks and brickwork. having height of 8 feet

Boundary Wall

Boundary wall made of masonary pucca, RCC framework between other plots. Boundary wall made of masonary pucca RCC framework , Jaali with planters in front of commercial.

Road Work

Internal Road on extended basement slab designed as per fire tender load finished with cement concrete Inter-locking tiles with kerb stone on sides for motorable vehicular movement and fire tender movement.

Footpaths

Footpaths will be of Cement concrete/Stone/Grass Pavers/ interlocking tiles. shall be constructed in Order to allow in filtration of surface runoff of rainwater

Water Supply Including Drinking Water Facilities

Project having dual source of Water supply. One from water supply available from authority sources and Second water to be collected in Under Ground and Terrace Tanks equipped with Hydro Pneumatic Pump.

Sewer System

Sewer will be connected through sewer line from all WC and then into collection chamber for Sewerage treatment (STP) as EC conditions.

Drain

surface rainwater will be collected via drain lines from balconies , roof top , open areas into rainwater harvesting pits to recharge the ground water level.

Parks

Landscape with civil work of masonary and stone, horticulture work and various types of plantation landscape architect.

Tree Planting

Trees planting along boundary of the plot as per sanctioned drawing from authority.

Design For Electric Supply Including Street Lighting

street lighting will have dual source of power. One is solar power and another is Power supply from N.P.C.L. as per required/ sanctioned load for common area and facilities along with D.G. power back-up.

Community Buildings

Community building having Banquet at ground floor with its ancillary areas, air conditioned Gym at first floor Indoor Game Facilities at ground floor.

Treatment and Disposal System of Sewage and Sullage water

sewage waste and sullage water will be treated by S.T.P. of 345 KLD capacity . treated water will be used for plantation and rest will be released through Authority Sewerage System.

Solid Waste Management And Disposal System

project use Organic Waste Converter to treat solid waste , Collection Bins and Segregation Table will be provided.

Water Conservation System

usage of dual flush systems for flush cisterns. Rain Water Harvesting system, Drip Irrigation with sprinklers.

Energy Management System Including Use of Renewable Energy

all street and park lighting will solar powered . 50 percent of the same will be provided with dual (solar/electrical ).

Fire Protection And Fire Safety System

Basement Hydrant, Sprinklers, 2 Nos. of Electrical Pump of 2850 lpm, 2 Nos. of Diesel Pump of 2850 lpm, 2 Nos. of Jockey Pumps of 180 lpm, Water Curtain Pump of 2850 lpm.

Social Infrastructure And Other Public Amenities Including Public Health Services

Proper water supply and sanitary facilities in visitor toilets at ground floor of every tower.

Emergency Evacuation Services

All towers have balconies and two staircases for emergency evacuation used for fire and life safety .

Other Miscellaneous Work

Guard Room at main entry and exit gate, electrical room /electrical sub-station , entrance lobbies at ground floor in all towers. CCTV surveillance system at entry and exit point.

Documents

Lease Deed

No: 8778 | Date: 17-04-2013

Allotment Letter issued by Competent Authority

No: PROP/BRS-05/2010/459 | Date: 30-03-2011

Allotment Letter issued by Competent Authority

No: Builders/BRS05-2010-2011/778 | Date: 10-12-2012

Allotment Letter issued by Competent Authority

No: Builders/BRS05-2010-11/778 | Date: 10-12-2012

Details of Encumbrances

Proforma of Completion Certificate(Occupancy)

ARCHITECT CERTIFICATE

Details of Encumbrances

Uploaded: 12-01-2021

Commencement Certificate

Uploaded: 12-11-2020

Other Plan(If Any)

Uploaded: 05-01-2021

Proforma of Application Form

Uploaded: 12-11-2020

Proforma of Allotment Letter

Uploaded: 04-12-2020

Proforma of Conveyance Deed

Uploaded: 04-12-2020

Proforma of Completion Certificate(Occupancy)

Uploaded: 07-12-2020

Waste Disposal Plan

Uploaded: 12-11-2020

Water Supply Plan

Uploaded: 12-11-2020

Electricity Supply Plan

Uploaded: 12-11-2020

Development Work Plan

Uploaded: 12-11-2020

Affidavit

Uploaded: 04-12-2020

CA CERTIFICATE

Uploaded: 08-01-2021

ARCHITECT CERTIFICATE

Uploaded: 05-01-2021

ENGINEERS CERTIFICATE

Uploaded: 08-01-2021

Permits

Orignal Permit NoPLG/(BP)/3207(S)/2019/5986
Orignal Permit Date13-09-2019
Valid Upto12-09-2024
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto12-09-2027
End Date12-09-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No-
Orignal Permit Date01-01-1900
Valid Upto13-09-2024
Revalidated Permit NoSM-24-Mar-2021:10493
Revalidated Permit Date10-07-2022
Revalidated Permit Valid Upto10-07-2027
Permit Extendable Upto10-07-2028
End Date10-07-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Civitech Developers Private Limited
Contractor AddressCivitech House, H-71, Sector-63, NOIDA-201301
Architect NameRahul Gupta
Architect AddressRD Design Atrium D-1 First Floor, Sector-7 NOIDA-201301
Architect Licence NumberCA/2010/48921
Structural Engineer Name Dr. Rajeev Dua
Structural Engineer AddressOptimization Consultants 202-203 ,Himland House , Commercial Complex, Karampura, New Delhi-110015
Mobile number(Project Co-ordinator)7838666909

Land Details

AFS

Showing 5 blocks with 274 units

Property Summary

Total Carpet Area

50975.20 m²

548691.96 ft²

Total Units

874

5 different types

Blocks & Floors

5

28 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:58.32 m²
Balconies:1262
Parking ratio:0.00 per unit

Block Tower A

52 units

Block Tower B

82 units

Block Tower C

80 units

Block Tower D

53 units

Block Tower E

7 units

Khasra Details

Total Area

18000.00 m²

193750.20 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH-02B Sector-12 Greater NOIDA
Area(In Sq. Mt.)18000

Other Details

Contractor Name (if any)Civitech Developers Private Limited
Contractor AddressCivitech House, H-71, Sector-63, NOIDA-201301
Architect NameRahul Gupta
Architect AddressRD Design Atrium D-1 First Floor, Sector-7 NOIDA-201301
Architect Licence NumberCA/2010/48921
Structural Engineer Name Dr. Rajeev Dua
Structural Engineer AddressOptimization Consultants 202-203 ,Himland House , Commercial Complex, Karampura, New Delhi-110015
Mobile number(Project Co-ordinator)7838666909