NewActive

City Center 150

Gautam Buddha Nagar, Uttar Pradesh
01-01-2021
Launch Date
New
Type
31-12-2023
Completion Date

Overview

Launch Date

01-01-2021

Completion Date

31-12-2023

RERA ID

UPRERAPRJ270081

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)11950
Project NameCity Center 150
Registration Fee (in Rs.)130000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)36
DistrictGautam Buddha Nagar
Original Start Date-
TehsilGautam Buddha Nagar
Proposed Start Date01-01-2021
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)8838
Proposed Completion Date31-12-2023

Location

Latitude

2825516

Longitude

7728501

Bank Details

Account no.250023112020
Name Of Account HolderCity Center
Bank NameInduslnd Bank
Branch AddressN-1011, Sector-18, Noida
Branch NameNoida
IFSC CodeINDB0000036

Development Works

Demarcation of Plots

Plot demarcation shall be completed as per approved building plan and the same is hatched on approved plan.

Boundary Wall

Boundary wall shall be as per approved building plan. 230 mm thick boundary wall (Brick work/ RCC) of height 1.5 meter to 2.5 meter shall be constructed.

Road Work

Complete CC internal road with paver pathways shall be constructed as per specification for required load and the same shall be as per approved plan.

Footpaths

Foot paths shall be constructed as per approved plan and the same shall be made of paver/cobbles/stone.

Water Supply Including Drinking Water Facilities

Noida Authority shall supply drinking water. It shall be further treated and distributed as required to respective units.

Sewer System

Centralized Sewage treatment plant as per design shall be provided. All sewage disposal shall go to STP. Recycled water shall be used for gardening.

Drain

Storm water system as per norms shall be provided. Storm water from terrace top, roads and other landscape area shall be connected to storm water line and rain water harvesting pits.

Parks

Open space with semi green paver is provided as per landscape drawing.

Tree Planting

Tree plantation is planned as per landscaping drawing for the project.

Design For Electric Supply Including Street Lighting

Electricity supply from UPPCL and street light as per approved electrical plan

Community Buildings

No community building in commercial block.

Treatment and Disposal System of Sewage and Sullage water

Sewage Plant will be installed at site. Sewage and sullage water will be treated by STP installed at site.

Solid Waste Management And Disposal System

Collection, Storage, Segregation and Disposal as per norms will be provided.

Water Conservation System

Water conservation available on site. Rain Water Harvesting is being provided at site as per applicable norms.

Energy Management System Including Use of Renewable Energy

Energy efficient equipment shall be installed as per requirement. Further we will use maximum of LED lights and compliance of norms.

Fire Protection And Fire Safety System

As per approved building plan and fire department approval. Fire fighting system will be provided as per NBC.

Social Infrastructure And Other Public Amenities Including Public Health Services

Social infrastructure and other public amenities shall be as per approved building plan.

Emergency Evacuation Services

Emergency evacuation services as per approved building plan and fire norms. Exit from each and every points have been planned. Emergency exit signage shall be provided at required location.

Other Miscellaneous Work

Other miscellaneous work as per approved building plan.

Documents

Lease Deed

No: Book No. 1, Serial No. 3962, Page No. 79 to 128 at S No. 526 | Date: 18-01-2012

Commencement Certificate

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Waste Disposal Plan

Water Supply Plan

Electricity Supply Plan

Development Work Plan

Details of Encumbrances

Uploaded: 01-04-2021

Commencement Certificate

Uploaded: 10-12-2020

Other Plan(If Any)

Uploaded: 10-12-2020

Proforma of Application Form

Uploaded: 09-12-2020

Proforma of Allotment Letter

Uploaded: 09-12-2020

Proforma of Conveyance Deed

Uploaded: 01-04-2021

Proforma of Completion Certificate(Occupancy)

Uploaded: 10-12-2020

Waste Disposal Plan

Uploaded: 10-12-2020

Water Supply Plan

Uploaded: 10-12-2020

Electricity Supply Plan

Uploaded: 10-12-2020

Development Work Plan

Uploaded: 23-11-2020

Affidavit

Uploaded: 01-04-2021

CA CERTIFICATE

Uploaded: 23-11-2020

ARCHITECT CERTIFICATE

Uploaded: 23-11-2020

ENGINEERS CERTIFICATE

Uploaded: 23-11-2020

Permits

Orignal Permit NoNOIDA/CAP/2020/IV-1434
Orignal Permit Date03-07-2020
Valid Upto02-07-2025
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto02-07-2025
End Date31-12-2023
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)CK Construction
Contractor AddressCK Construction at Plot-5, Tower-B, Sector-127,Noida
Architect NameTribeca Buildtech LLP- Marketing and PMC AND Confluence care of Vishal Sharma
Architect AddressTribeca at First Floor, One Horizon Center, Dlf Phase V, Sector-43, Gurugram AND Confluence at B-421, New Friends Colony, New Delhi-110065
Architect Licence NumberCA-98/23261
Structural Engineer NameOptimum Design Private Limited
Structural Engineer AddressB-24, Sctor-67, Noida, U.P-201301
Mobile number(Project Co-ordinator)9958419010

Land Details

AFS

Showing 1 blocks with 272 units

Property Summary

Total Carpet Area

11002.50 m²

118429.81 ft²

Total Units

272

2 different types

Blocks & Floors

1

5 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:40.45 m²
Balconies:0
Parking ratio:0.00 per unit

Block City Center 150

272 units

Khasra Details

Total Area

11950.00 m²

128628.60 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoSC-01/B Sector 150, Noida
Area(In Sq. Mt.)11950

Other Details

Contractor Name (if any)CK Construction
Contractor AddressCK Construction at Plot-5, Tower-B, Sector-127,Noida
Architect NameTribeca Buildtech LLP- Marketing and PMC AND Confluence care of Vishal Sharma
Architect AddressTribeca at First Floor, One Horizon Center, Dlf Phase V, Sector-43, Gurugram AND Confluence at B-421, New Friends Colony, New Delhi-110065
Architect Licence NumberCA-98/23261
Structural Engineer NameOptimum Design Private Limited
Structural Engineer AddressB-24, Sctor-67, Noida, U.P-201301
Mobile number(Project Co-ordinator)9958419010
City Center 150 by LOGIX INFRADEVELOPERS PRIVATE LIMITED | ReraTracker