Project Consists of Apartments so no need for demarcation of plots
10 Feet Boundary Wall of Bricks
Concrete Road with bituminous cover with high-quality concrete pavers
The footpath will be built through Inter-Locking Tiles
Overhead Tanks shall be provided on the building terrace for distribution through gravity. End-user shall use their Individual RO System.
A centralized Sewerage System shall be provided which will be connected to the Municipal Sewerage System.
The stormwater system shall be provided which will be connected to the Municipal Drain Line.
There is no park in our tower. However, there are three green areas as per the approved plan for the whole project.
There are several provisions for Tree Planting as per the approved area of the whole project.
We have designed the system as per Local Electricity Board and consider centralized transformer, HT Panel, LT panel, Feeder Pillar, and DG backup for common services like External Lighting and Pump Room.
There are no community buildings in our tower. However, there is a clubhouse as per the approved plan of the whole project.
A centralized sewerage system shall be provided which will be connected to the Municipal Sewerage System
There is a proper garbage collection area for solid waste management.
A well-designed rainwater harvesting system shall be provided.
We will use LED Lights as well as Solar Lights in External Areas as well as on the Roof.
Since the building is less than 50 meter in height all the fire norms shall be followed as NBC and approval of the fire department
Sewerage, Stormwater, and Overhead Tank facilities shall be provided.
The staircase will be provided wth emergency exit doors
Luxurious Entrance lobby shall be provided
Showing 1 blocks with 17 units
Total Carpet Area
54633.96 m²
588074.48 ft²
Total Units
111
2 different types
Blocks & Floors
1
17 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3422.95 m²
36844.29 ft²