Launch Date
Completion Date
RERA ID
26.79311111
81.01269444
Project consists of Commercial space so no need for demarcation of plots.
150 RMT, 10 feet wide Boundary wall of Bricks.
6 m wide and 150 m long Concrete Road with Bituminous cover with high-quality concrete pavers.
The footpath will be built through inter-locking tiles.
Overhead tanks shall be provided on the building terrace for distribution through gravity. End-user shall use their individual RO system.
139 m long, centralized Sewerage System shall be provided which will be connected to Municipal Sewerage Line.
The storm water system shall be provided which will be connected to Municipal Drain Line.
There is no Park in our Tower. However, there are three Green Areas as per approved plan of the whole Project.
There are several provisions for Tree Planting as per the approved area of the whole Project.
We have designed the system as per Local Electricity Board and consider centralized transformer, HT panel, LT Panel, Feeder Pillar, and DG back-up for common services like Lift, External Lighting and Pump room.
There are no community buildings in our Project.
A centralized sewerage system shall be provided which will be connected to Municipal Sewerage System.
There is a proper garbage collection area for solid waste management.
A well-designed rainwater harvesting system shall be provided.
We will use LED lights as well as Solar Lights in External Areas as well as on the Roof.
Since the building is less than 50 meters in height all the Fire norms shall be followed as per NBC and the approval of the Fire department.
Sewerage, Stormwater and Overhead Tank facilities shall be provided.
The staircase will be provided with emergency exit doors.
Luxurious Entrance Lobby shall be provided.
Showing 1 blocks with 18 units
Total Carpet Area
2304.34 m²
24803.69 ft²
Total Units
31
1 different types
Blocks & Floors
1
5 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3980.00 m²
42840.32 ft²