Plaster and painting works with RCC pillar constructed of 7 feet boundary one main gate with guard room and CCTV camera
6 Mtr. wide cc/bitment road
6 mtr. wide footpath with paver blocks
Each block have seperate overhead tank
Provision of STP and treated water will go to public drain
Provision of rain water harwasting and flow will go to public strom water drain
Define for 15 percent area park in common area
Around the park and on both side of the road
Street light are available all around the park and on the road
There is community building in the common area with all facilities
N/A
N/A
Provision of rain water harwasting and flow will go to public strom water drain
N/A
As per guidlines
N/A
N/A
N/A
Showing 5 blocks with 180 units
Total Carpet Area
224478.37 m²
2416262.73 ft²
Total Units
360
3 different types
Blocks & Floors
5
12 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
19860.00 m²
213771.05 ft²