NewActive

SHRI TULSI MEERA HOMES

Agra, Uttar Pradesh
25-07-2021
Launch Date
New
Type
24-09-2026
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

24-09-2026

RERA ID

UPRERAPRJ711028

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)5472
Project NameSHRI TULSI MEERA HOMES
Registration Fee (in Rs.)32500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)62
DistrictAgra
Original Start Date-
TehsilAgra
Proposed Start Date25-07-2021
Sanctioning Competent AuthorityAgra Development Authority
Project Cost (in Lacs)372
Proposed Completion Date24-09-2026

Location

Latitude

27.171765

Longitude

77.932119

Bank Details

Account Details
Name of the AccountTulsi Infrapromoters Pvt. Ltd. Collection Account For Shri Tulsi Meera Homes
Account Number120000096784
Bank NameCANARA BANK
Branch NameSME, Sanjay Place Agra
Branch AddressJeevan Prakash Building, Sanjay Place Agra
IFSC CodeCNRB0002376
Branch DistrictAgra
Separate Account Details
Name of the AccountTulsi Infrapromoters Pvt. Ltd. Separate Account For Shri Tulsi Meera Homes
Account Number120000099589
Bank NameCANARA BANK
Branch NameSME, SANJAY PLACE, AGRA
Branch AddressJEEVAN PRAKASH BUILDING, SANJAY PLACE AGRA
IFSC CodeCNRB0002376
Branch DistrictAgra
Transaction Account Details
Name of the AccountTulsi Infrapromoters Pvt. Ltd. Transaction Account for Shri Tulsi Meera Homes
Account Number120000096272
Bank NameCanara Bank
Branch NameSME-Sanjay Place- Agra
Branch AddressJeevan Prakash Building, Sanjay Place Agra
IFSC CodeCNRB0002376
Branch DistrictAgra

Development Works

Demarcation of Plots

All the plots will be levelled and demarcated to the exact dimension and orientation as per the sanctioned map from Agra Development Authority. We are also in process to apply for some individual house maps with ADA, the same will be intimated to U.P.RERA once the approvals are obtained.

Boundary Wall

A seven feet high boundary wall will be constructed along the project boundary for the safe and controlled access in to the project. The brick wall will be constructed in cement mortar then plastered and painted. The boundary wall foundation will be 4 feet deep.

Road Work

The road will be constructed using the latest techniques. The Subgrade, Drainage Layer , Sub-base and the wearing course will be constructed wit select material and compacted to minimum density of 95 percent. Longitudinal and transverse slopes will be maintained for smooth riding surface and quick removal of rain water.

Footpaths

Interlocking paver tiles will be placed on the compacted earth over the sand bed of 40 to 50 mm. The paver block will be of M-20 grade providing the anti-slippery surface for walking. The paver block will be installed at suitable locations and in the periphery of park.

Water Supply Including Drinking Water Facilities

Ground water will be extracted through a submersible pump delivered to the Overhead tank. The Long lasting PVC pipe lines will then be placed underground to lead up to each and every plot. The Potable cum drinking water will be provided for the domestic purpose.

Sewer System

A sewer lines will be constructed using off site and in-situ methods, A 600mm dia. concreted piies will be laid and the distribution will done in accordance t number of domestic units. The slopes will be maintained to take the waste to the Sewage treatment plant. Inspection chambers will be constructed at required distance and bends for the maintenance of sewer line.

Drain

Lined covered and open drains will be constructed with Brick and cement mortar plastered with rich cement sand mix . The depth of the drain and the slope will assist the continuous and smooth removal of drain water .

Parks

A lush green park will be developed to the area as per the sanctioned map. The park will have play area for children and relaxing area for elders. The hedge will be developed along the periphery of park along with trees.

Tree Planting

Multiple tree types will be planted . The plants will be selected to enhance the beauty of the project at the same time the ones that the soil type of project will suit to.

Design For Electric Supply Including Street Lighting

A dedicated Transformer is planned. There will be 7 electric poles and and electric room. The power connection will be s per load sanction by DVVNL for the domestic cum residential usage in the project . The distribution boxes will be installed and individual connection line will be provided for each unit

Community Buildings

Not applicable

Treatment and Disposal System of Sewage and Sullage water

The multi stage Sewage treatment plant will b installed in the project . The Readymade plant will be installed . the casing chambers will be constructed with leach proof design. The treated waste will be disposed at the designated disposal point.

Solid Waste Management And Disposal System

A dalab ghar will be constructed in the project . in addition the dustbins will be placed at common areas.

Water Conservation System

rain water harvesting pit and recharge well will be constructed. The perforated pipe connected to the pit will go to minimum depth of 10m that will help recharge the water table. The maintainable filter layers will be placed before rain water reaches the water table.

Energy Management System Including Use of Renewable Energy

Not Applicable

Fire Protection And Fire Safety System

Not Applicable

Social Infrastructure And Other Public Amenities Including Public Health Services

Not Applicable

Emergency Evacuation Services

Not Applicable

Other Miscellaneous Work

Yes, as per the project needs for the betterment of project.

Documents

Registry Document

No: 4134 | Date: 21-05-2019

Extract of Khatauni

No: 1424-1429 | Date: -

Other Plan(If Any)

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Development Work Plan

Details of Encumbrances

Uploaded: 07-10-2021

Commencement Certificate

Uploaded: 07-10-2021

Other Plan(If Any)

Uploaded: 27-10-2021

Proforma of Application Form

Uploaded: 08-10-2021

Proforma of Allotment Letter

Uploaded: 08-10-2021

Waste Disposal Plan

Uploaded: 08-10-2021

Water Supply Plan

Uploaded: 08-10-2021

Electricity Supply Plan

Uploaded: 08-10-2021

Development Work Plan

Uploaded: 27-10-2021

Affidavit

Uploaded: 08-10-2021

CA CERTIFICATE

Uploaded: 08-10-2021

ARCHITECT CERTIFICATE

Uploaded: 08-10-2021

ENGINEERS CERTIFICATE

Uploaded: 08-10-2021

Permits

Orignal Permit NoPlotted Resi Development/Plotted Housing/01286/ADA/LD/21-22/0147
Orignal Permit Date25-09-2021
Valid Upto24-09-2026
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto23-09-2029
End Date24-09-2026
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Self
Contractor AddressCabin at Shop No. 15, Fisrt Floor Kaveri Center, 57/2 Sanjay Place Agra U.P 282002
Architect NameMS Modcon- Daya Shanker Sharma
Architect AddressG-5, Kaveri Center, Sanjay Place, Agra 282002
Architect Licence NumberM-146423-4
Structural Engineer NameMS Modcon- Daya Shanker Sharma
Structural Engineer AddressG-5, Kaveri Center, Sanjay Place Agra-282002
Mobile number(Project Co-ordinator)8936902999

Khasra Details

Total Area

5740.00

61784.79 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot NoKhasra No. 263 (Part) Mauja Pathauli
Area(In Sq. Mt.)5740

Other Details

Contractor Name (if any)Self
Contractor AddressCabin at Shop No. 15, Fisrt Floor Kaveri Center, 57/2 Sanjay Place Agra U.P 282002
Architect NameMS Modcon- Daya Shanker Sharma
Architect AddressG-5, Kaveri Center, Sanjay Place, Agra 282002
Architect Licence NumberM-146423-4
Structural Engineer NameMS Modcon- Daya Shanker Sharma
Structural Engineer AddressG-5, Kaveri Center, Sanjay Place Agra-282002
Mobile number(Project Co-ordinator)8936902999
SHRI TULSI MEERA HOMES by TULSI INFRAPROMOTERS PRIVATE LIMITED | ReraTracker