Launch Date
Completion Date
RERA ID
25.481017
78.599536
71 DUPLEXS OF DIFFERENT SIZES WILL BE CONSTRUCTED BY DEVELOPER AS PER SANCTIONED LAYOUT PLAN WITH BEST QUALITY MATERIAL . ALONG WITH DUPLEXS DEVELOPMENT OF GARDENS AND OTHER EMENETIES WILL ALSO BE DONE . PLOTS AND GARDENS WILL BE DEMARCATED AND CONSTRUCTED AS PER APPROVED SANCTION PLAN
BOUNDARY WALL CONSTRUCTION IS UNDER CONSTRUCTION . THE COLONY WILL BE FULLY COVERED BY BOUNDARY WALL AND WILL BE ONE GATED COLONY
BITUMAN BASED ROAD WILL BE CONSTRUCTED AS PER APPROVED MAP. BEST QUALITY ROADS WILL BE CONSTRUCTED WITH USE OF A GRADE MATERIAL
WILL BE CONSTRUCTED AS PER REQUIREMENT
WATER WILL BE SUPPLIED THROUGH BORING AND GOVERNMENT WATER SUPPLY AFTER TAKING APPROVAL FROM STATUTORY DEPARTMENT . OVER HEAD WATER TANK CONSTRUCTION IS IN PROGRESS OF CAPACITY OF 2.5 LAKHS LITRE WHICH WILL BE STOTE THE WATER FOR COLONY CONSUMPTION
CENTRALISED SEWER SYSTEM SHALL BE PROVIDED . ALL SEWERAGE WATER SHALL GO THE TOWNSHIP STP FOR TREATMENT AND TREATED WATER SHALL BE RECYCLED AND IT WILL BE USED IN GARDENING AND OVERFLOW FROM THE STP PLANT SHALL BE CONNECTED WITH THE TOWENSHIP SEWERAGE
STORM WATER SYSTEM SHALL BE PROVIDED . STORM WATER FROM ROADS AND OTHER LANDSCAPE AREA SHALL BE CONNECTED TO STORM WATER DRAIN CHANNEL AND GO TO THE RAIN WATER HARVESTING PIT FOR RECHARGE THE GROUND WATER AND OVERFLOW SHALL BE CONNECTED WITH TOWENSHIP DRAIN
GREEN PARKS ARE UNDER CONSTRUCTION AND WILL BE CONSTRUCTED AS PER APPROVED LAYOUT .
TREE WILL BE PLANTED OUTSIDE EVERY HOUSE AS WELL AS ALL OVER THE COLONY FOR BETTER STANDARD OF LIVING AND FRESH AIR
WILL BE DESIGNED AS PER GUIDELINES ISSUED BY LOCAL ELECTRICITY DEPARTMENT
NO COMMUNITY BUILDING IS PROPOSED FOR THE SAID PROJECT
CENTRALISED SEWERAGE SYSTEM SHALL BE PROVIDED . ALL SEWERAGE WATER SHALL GO TO THE TOWNSHIP STP FOR TREATMENT AND TREATED WATER SHALL BE RECYCLED AND IT WILL BE USED IN GARDENING AND OVERFLOW FROM THE STP PLANT SHALL BE CONNECTED WITH THE TOWENSHIP SEWERAGE
PROPER DUSTBINS WILL BE INSTALLED AT DESIGNED LOCATIONS FOR COLLECTION OF SOLID WASTE AND DISPOSAL AS MENTIONED IN APPROVED LAYOUT
A WELL DESIGNED WATER HARVESTING SYSTEM WILL BE DESIGNED FOR WATER CONSERVATION
LED LIGHTS AND OTHER ENERGY SAVING DEVICES WILL BE INSTALLED IN EXTERNAL AREA . IN STP ALL THE EQUIPMENT SHALL HAVE ENERGY EFFICIENT MOTORS
AS PER FIRE DEPARTMENT AND NBFC NORMS THE HOUSE IS LESS THAN 30M OF HEIGHT . SO FIRE PROTECTION AND SAFETY WORK IS NOT APPLICABLE FOR THE PROJECT
SEWERAGE , STORM WATER AND WATER SUPPLY SYSTEM SHALL BE PROVIDED . STP WILL BE INSTALLED FOR REUSE OF TREATED WATER
NOT APPLICABLE ON DUPLEX HOUSES
AS PER APPROVED MAP
Total Area
20570.00 m²
221413.42 ft²