Since this is a phase of the already complete project, the Demarcation of plots is already done.
Around 230 mm thick Boundary wall exist in the project.
Around 20 ft wide road will be provided, All internal roads will have concrete pavers or equivalent finishes.
Wide footpath in thick concrete pavers or equivalent finishes
Ground Water Supply facility to be arranged .
Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force.
Storm water drain shall be Provided. Storm water from Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
"We will provide green area with the different activities and the green area will have gaming facilities for kids."
Several small and big plants and trees shall be put in the park and the surroundings
System has been designed as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting, etc.
NA
Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force.
"There are a proper garbage collection area provided for the solid waste management."
Rain water harvesting system shall be provided for the whole building complex to conserve water
We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
All the fire norms shall be followed as NBC and approval of fire department
NA
We are providing fire escape stair case with sufficient width that open to the wide corridor for the public to safely evacuate in the case of emergency.
We are providing amenities like Gym
Showing 1 blocks with 43 units
Total Carpet Area
15437.02 m²
166162.54 ft²
Total Units
137
5 different types
Blocks & Floors
1
10 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
16851.00 m²
181382.48 ft²