Launch Date
Completion Date
RERA ID
25 degree17'19.23 North
82 degree 56'09.87 east
Concrete pavers based road will be created for all internal road works.
Not Applicable
2 Nos of boring will provide the water supply to the plot & individual. Terrace tanks shall be provided on building terrace for distribution through gravity.
Centralized sewerage system shall be provided. All sewarge water shall be connect with the municipal sewarge system.
Storm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain line.
Small Park
All around the boundary wall small plants will be provided.
We have design the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting,Pump room etc.
Small Community hall.
Not Applicable.
Not Applicable.
A well designed rain water harvesting system shall be provided for the whole building complex to conserve water
We will use LED light fitting in external, Parking etc areas.
Since the building is less than 45m in height all the fire norms shall be followed as NBC and approval of fire department
Not Applicable.
Not Applicable.
Not Applicable.
Showing 2 blocks with 74 units
Total Carpet Area
3901.23 m²
41992.45 ft²
Total Units
74
5 different types
Blocks & Floors
2
8 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
2292.64 m²
24677.75 ft²