Plot Demarcation shall be complete by the fixing of RCC pillar on each unit.
Boundary wall of the entire project shall be constructed
Semi Dense bituminous concrete (SDBC) roads shall be constructed with the base of GSB & WMM
Footpaths shall be paving by CC pavers or earthen footpath
Water supply by overhead tank and underground tank with medium density polyethylene piping system
RCC hume pipes for Sewerage system
RCC hume pipes for drainage system
Green spaces will be developed as per approved layout plan
70 trees to be planted
Electrical infrastructure will be developed as per approved electrical layout
Club will be developed with all the facilities/amenities in our existing township ORO City. The facilities can be utilized on paid basis, and shall not allow ownership of the club building/premises
MBBR- System S.T.P
Collection space in STP area. The disposal will be done by nagar nigam vendor.
Rain Water Harvesting System
Solar water heating/Solar energy system to be decided later on the basis of feasibility study.
It is a plotted development project. Therefore, fire safety/protection system will not be installed
The area for socio-cultural services is applicable where the density of population is 2500 or above, whereas the population density of ORO City Extension- Plots/Villas is 700 only.
Safe evacuation Plan of the occupants is important for high-rise building whereas this is a plotted development.
-
Total Area
13745.67 m²
147957.02 ft²
Processing Time
886 days
From application to approval
31-12-2021
04-06-2024