Launch Date
Completion Date
RERA ID
26.939167
80.964167
Commercial Plot is well demarcated at the site (As per sanctioned Layout)
No Boundary wall will be made
Semi Dense bituminous concrete (SDBC) roads shall be constructed with the base of GSB & WMM
Footpaths shall be paving by CC pavers or earthen footpath
Water supply by overhead tank and underground tank with medium density polyethylene piping system (will be connected with ORO City planning)
RCC hume pipes for Sewerage system (will be connected with layout of ORO City planning)
RCC hume pipes for drainage system (will be connected with layout of ORO City planning)
As per approved layout of ORO city (mini township) green/park spaces are developed at the site.
6 trees to be planted
Electrical infrastructure will be developed as per approved electrical layout (will be connected with layout of ORO City planning)
Since it is a commercial project, therefore not applicable.
MBBR- System S.T.P (will be connected with layout of ORO City planning)
Collection space in the STP area(will be connected with layout of ORO City planning). The disposal will be done by the Nagar Nigam vendor. NOC from Nagar Nigam Procured ( attached for reference)
Rain Water Harvesting System will be developed.
Solar heating system might be provided.
Fire safety system will be installed as per provisional NOC no- UPFS/2019/9119/LCK/LUCKNOW/550/CFO dated 13.07.2019, given by the fire department.
Since it is a commercial project, therefore not applicable.
Exit signage and fire staircase being proposed in the approved drawing.
Canopy of Poly carbonate sheet may be provided on the first floor.
Showing 1 blocks with 49 units
Total Carpet Area
707.25 m²
7612.77 ft²
Total Units
49
1 different types
Blocks & Floors
1
3 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
1038.00 m²
11172.93 ft²