NewActive

ORO ATRIUM

Lucknow, Uttar Pradesh
01-01-2020
Launch Date
New
Type
21-06-2025
Completion Date

Overview

Launch Date

01-01-2020

Completion Date

21-06-2025

RERA ID

UPRERAPRJ286736

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)1038
Project NameORO ATRIUM
Registration Fee (in Rs.)21000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)66
DistrictLucknow
Original Start Date-
TehsilBakshi Ka Talab**
Proposed Start Date01-01-2020
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)460
Proposed Completion Date21-06-2025

Location

Latitude

26.939167

Longitude

80.964167

Bank Details

Account no.6193002100002033
Name Of Account HolderOROConstructions Pvt. Ltd
Bank NamePunjab National Bank
Branch AddressVibhuti Khand, Gomtinagar
Branch NameVibhuti Khand Gomtinagar
IFSC CodePUNB0619300

Development Works

Demarcation of Plots

Commercial Plot is well demarcated at the site (As per sanctioned Layout)

Boundary Wall

No Boundary wall will be made

Road Work

Semi Dense bituminous concrete (SDBC) roads shall be constructed with the base of GSB & WMM

Footpaths

Footpaths shall be paving by CC pavers or earthen footpath

Water Supply Including Drinking Water Facilities

Water supply by overhead tank and underground tank with medium density polyethylene piping system (will be connected with ORO City planning)

Sewer System

RCC hume pipes for Sewerage system (will be connected with layout of ORO City planning)

Drain

RCC hume pipes for drainage system (will be connected with layout of ORO City planning)

Parks

As per approved layout of ORO city (mini township) green/park spaces are developed at the site.

Tree Planting

6 trees to be planted

Design For Electric Supply Including Street Lighting

Electrical infrastructure will be developed as per approved electrical layout (will be connected with layout of ORO City planning)

Community Buildings

Since it is a commercial project, therefore not applicable.

Treatment and Disposal System of Sewage and Sullage water

MBBR- System S.T.P (will be connected with layout of ORO City planning)

Solid Waste Management And Disposal System

Collection space in the STP area(will be connected with layout of ORO City planning). The disposal will be done by the Nagar Nigam vendor. NOC from Nagar Nigam Procured ( attached for reference)

Water Conservation System

Rain Water Harvesting System will be developed.

Energy Management System Including Use of Renewable Energy

Solar heating system might be provided.

Fire Protection And Fire Safety System

Fire safety system will be installed as per provisional NOC no- UPFS/2019/9119/LCK/LUCKNOW/550/CFO dated 13.07.2019, given by the fire department.

Social Infrastructure And Other Public Amenities Including Public Health Services

Since it is a commercial project, therefore not applicable.

Emergency Evacuation Services

Exit signage and fire staircase being proposed in the approved drawing.

Other Miscellaneous Work

Canopy of Poly carbonate sheet may be provided on the first floor.

Documents

Registry Document

No: 10083 | Date: 08-07-2014

Registry Document

No: 506 | Date: 09-08-2016

Registry Document

No: 815 | Date: 19-11-2016

Extract of Khatauni

No: Reply to query letter 2112191/UP-RERA/Project Reg./2018-19 | Date: -

Details of Encumbrances

Uploaded: 17-12-2019

Commencement Certificate

Uploaded: 26-12-2019

Other Plan(If Any)

Uploaded: 17-12-2019

Proforma of Application Form

Uploaded: 17-12-2019

Proforma of Allotment Letter

Uploaded: 17-12-2019

Proforma of Conveyance Deed

Uploaded: 17-12-2019

Proforma of Completion Certificate(Occupancy)

Uploaded: 17-12-2019

Waste Disposal Plan

Uploaded: 17-12-2019

Water Supply Plan

Uploaded: 17-12-2019

Electricity Supply Plan

Uploaded: 17-12-2019

Development Work Plan

Uploaded: 18-12-2019

Affidavit

Uploaded: 26-12-2019

CA CERTIFICATE

Uploaded: 17-12-2019

ARCHITECT CERTIFICATE

Uploaded: 18-12-2019

ENGINEERS CERTIFICATE

Uploaded: 17-12-2019

Permits

Orignal Permit NoMAP20190507133449880
Orignal Permit Date24-12-2019
Valid Upto22-12-2024
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto22-12-2026
End Date22-12-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)ORO Constructions Pvt. Ltd.
Contractor Address503, 5th floor, Eldeco Corporate Tower, Vibhuti Khand, Gomti Nagar, Lucknow.
Architect NameSANJAY KUMAR GUPTA
Architect Address108, 1st floor eldeco corporate chamber-1 vibhuti khand gomti nagar lucknow
Architect Licence Number CA/89/12382
Structural Engineer NameVINOD KRISHNA- BUILDINFRA TECH
Structural Engineer AddressK1/1570, SECTOR K, AASHIYANA COLONY, LUCKNOW,- 226012, UTTAR PRADESH
Mobile number(Project Co-ordinator)9415155984

Land Details

AFS

Showing 1 blocks with 49 units

Property Summary

Total Carpet Area

707.25

7612.77 ft²

Total Units

49

1 different types

Blocks & Floors

1

3 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:14.43
Balconies:0
Parking ratio:0.00 per unit

Block ATRIUM

49 units

Khasra Details

Total Area

1038.00

11172.93 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No652
Area(In Sq. Mt.)1038

Other Details

Contractor Name (if any)ORO Constructions Pvt. Ltd.
Contractor Address503, 5th floor, Eldeco Corporate Tower, Vibhuti Khand, Gomti Nagar, Lucknow.
Architect NameSANJAY KUMAR GUPTA
Architect Address108, 1st floor eldeco corporate chamber-1 vibhuti khand gomti nagar lucknow
Architect Licence Number CA/89/12382
Structural Engineer NameVINOD KRISHNA- BUILDINFRA TECH
Structural Engineer AddressK1/1570, SECTOR K, AASHIYANA COLONY, LUCKNOW,- 226012, UTTAR PRADESH
Mobile number(Project Co-ordinator)9415155984