EWS/LIG group housing plot is being demarcated at the site as per the approved layout
Boundary wall of the entire project shall be constructed
Semi Dense bituminous concrete (SDBC) roads shall be constructed with the base of GSB & WMM
Footpaths shall be paving by CC pavers or earthen footpath
Water supply by terrace tank with medium density polyethylene piping system
RCC hume pipes for Sewerage system
RCC hume pipes for drainage system
Green spaces will be developed as per approved plan
15(nos) of trees will be planted
Electrical infrastructure will be developed as per electrical drawing
Club will be developed with all the facilities/amenities within the township. Though if desired the facility of the same can be availed on chargeable basis.
Own MBBR- System STP
Collection space in the STP area. The disposal will be done by the Nagar Nigam vendor.
Rain water Harvesting System
Solar water heating System will be installed.
Fire safety system will be installed as per provisional NOC no- UID 2018/51712/LKW/Lucknow/3331/CFO, given by the fire department.
Plot for school has been provided in the approved layout.
Exit signage and fire staircase being proposed in the approved drawing
-
Showing 1 blocks with 14 units
Total Carpet Area
4259.40 m²
45847.76 ft²
Total Units
124
2 different types
Blocks & Floors
1
7 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
2793.00 m²
30063.57 ft²
Processing Time
695 days
From application to approval
19-07-2022
13-06-2024