Launch Date
Completion Date
RERA ID
26.767592
80.911096
Plots will be demarcated through numbering on RCC bricks
NA
From the main entrance gate, we have 80mm thick damar road throughout the project whose wideness starts 9 mtr.
NA
We will provide 2 nos of pump from the requirement of blocks through underground pipelines.
A modular sewerage system shall be provided. All sewer water shall go to STP and overflow from STP shall go into the municipal sewerage system when comes into force.
Strom water shall be provided. Strom water from roads and other landscape areas shall connect to stormwater drain channel and go to rainwater harvesting pit for recharge the groundwater and overflow shall connect to the municipal drain line.
We will provide green area with different activities and it will have gaming facilities for kids.
We will provide many types of trees all along with the boundary work
We will design and implement system as per the local electricity board and will consider centralized transformer, HT/LT panel, Feeder, Pillar, and DG back for common service like external lighting fountain pump room etc.
NA
A modular sewerage system shall be provided. All sewerage water shall go to STP and overflow from STP shall connect with the municipal sewerage system when comes to force
There are proper garbage collection areas provided for solid waste management
We will suggest to individuals to use low flow fixtures as well as a dual flush cistern and raw water harvesting system to reduce consumption and improve ground water level.
We will use LED lights fitting in the external area as well as solar lights. In the pump room, all types of equipment have energy-efficient motors.
NA
NA
NA
NA
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
13113.00 m²
141147.02 ft²